本文选题:汽油机电喷系统 + 研发项目 ; 参考:《天津工业大学》2017年硕士论文
【摘要】:汽油机电喷系统(GEEFIS)研发项目的风险日益增多,国内企业对GEEFIS研发项目的风险管理与控制尚未重视,虽然也采取了一些风险管理措施,但大部分不适应企业实际需要,收效甚微。国内企业只有建立MSF风险控制模型,不断地改进实施的风险管理过程,才能保证GEEFIS研发项目一直处于最优的安全防护之下。本文在国内外许多研发项目风险管理与控制理论的基础上,针对GEEFIS研发项目,提出了基于MSF模型的风险控制结构和风险识别、风险分析、风险计划、风险跟踪、风险控制和风险库六个模块的基本内容和技术方法。MSF模型利用各模块的活动和相互的联系,来对GEEFIS研发项目的风险给予及时处理,并为以后的风险控制提供建议和改进措施。提出了使用MSF模型进行风险管理的具体过程以及风险规划、风险识别、风险评价、风险处理和风险监控五个阶段设计的目标和主要活动。针对科森公司的GEEFIS研发项目实际情况,本文提出了国内企业通过前期准备,风险识别模块构建、风险分析模块构建、风险计划模块构建、风险追踪模块构建、风险控制模块构建和风险知识库模块构建的过程来在GEEFIS研发项目中进行风险控制的具体实施过程、效果和对策。为汽油机设计企业实施MSF风险控制模型提供了具体方案,对如何实施GEEFIS研发项目风险管理与控制提供一个明确的可操作的指导。本文的研究,对于GEEFIS研发企业了解风险管理过程和MSF风险控制模型,以及使用MSF模型进行风险控制均具有重要的参考价值。
[Abstract]:The risk of the research and development project of gasoline engine Electronic injection system (GEEFIS) is increasing day by day. The risk management and control of the GEEFIS R & D project have not been paid much attention to in domestic enterprises. Although some risk management measures have been taken, most of them do not meet the actual needs of the enterprise and have little effect. Only by establishing MSF risk control model and continuously improving the risk management process can domestic enterprises ensure that GEEFIS R & D project is always under optimal security protection. Based on the risk management and control theory of many R & D projects at home and abroad, this paper puts forward the risk control structure and risk identification, risk analysis, risk planning, risk tracking based on MSF model for GEEFIS R & D projects. The basic contents and technical methods of six modules of risk control and risk base. MSF model utilizes the activities and interrelation of each module to deal with the risk of GEEFIS R & D project in time and provides suggestions and improvement measures for future risk control. The specific process of risk management using MSF model and the design objectives and main activities of risk planning, risk identification, risk evaluation, risk treatment and risk monitoring are presented. In view of the actual situation of GeEFIS R & D project of Corsen Company, this paper puts forward the domestic enterprises through the pre-preparation, risk identification module construction, risk analysis module construction, risk planning module construction, risk tracking module construction, The process of constructing risk control module and risk knowledge base module to carry out the concrete process, effect and countermeasure of risk control in GEEFIS R & D project. It provides a concrete scheme for the implementation of MSF risk control model in gasoline engine design enterprises, and provides a clear and operable guidance on how to implement the risk management and control of GEEFIS R & D project. The research in this paper has important reference value for GEEFIS R & D enterprises to understand the risk management process, MSF risk control model, and use MSF model for risk control.
【学位授予单位】:天津工业大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.6;F272.3
【参考文献】
相关期刊论文 前10条
1 CHENG Anyu;LI Haining;XIONG Liangbo;;A Model-Based Calibration Method of Automotive Electronic Control Unit[J];Wuhan University Journal of Natural Sciences;2016年02期
2 Mingguang Zheng;Jinquan Yan;Jun Shentu;Lin Tian;Xujia Wang;Zhongming Qiu;;The General Design and Technology Innovations of CAP1400[J];Engineering;2016年01期
3 方江yN;;IT软件项目风险管理研究[J];山西广播电视大学学报;2015年04期
4 刘思蕙;;项目集成风险管理模型研究[J];住宅与房地产;2015年19期
5 文伟平;郭荣华;孟正;柏v,
本文编号:2117916
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2117916.html