G112TJ高速公路工程项目进度管理研究
[Abstract]:With the continuous development of our economy and the rapid improvement of transportation capacity, expressway becomes an important foundation and link of economic development, so the requirement of expressway construction is becoming more and more strict. As the main content of expressway project management, project schedule control management has practical application significance for expressway project management. By exploring and analyzing the whole flow of schedule control in G112TJ expressway project, this paper analyzes some defects in the detailed contents of construction management, improves the related deficiencies, and sums up the experience further. For the project management in the future application, lay a good foundation. First of all, this paper analyzes the background and significance of expressway project schedule and control, summarizes the current research situation at home and abroad, and determines the technical route and research methods. Combing the highway project schedule control related concepts, compare the relevant methods, for follow-up research services. Secondly, by describing the general situation of the G112TJ highway section project, analyzing the basic resources of the project, making use of the critical path method and the network planning method to draw up the project schedule plan, on the basis of this, the reasonable establishment of the project organization structure, The implementation dynamic monitoring is carried out in the stage of project implementation, including: project progress control report, deviation analysis of project schedule control and adoption of appropriate corrective measures. Finally, the evaluation model of schedule planning and control is established by AHP- fuzzy comprehensive evaluation method, and the indexes of each layer are systematically analyzed. According to the three layer index system of project schedule control process management, the project schedule control process management model is constructed. The weight of each index is determined by AHP, and the project schedule control process management model is constructed by using fuzzy comprehensive evaluation method. The evaluation and analysis of each project level and index layer are carried out. Finally, the whole implementation process is scored, and some suggestions for improvement are put forward.
【学位授予单位】:燕山大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U415.1
【相似文献】
相关期刊论文 前10条
1 杨劲;对“关于《建设项目进度控制》一书的修改意见”一文的反馈[J];建设监理;1995年02期
2 李世蓉;对“关于《建设项目进度控制》一书的修改意见”一文的几点看法[J];建设监理;1995年02期
3 赵晓明,夏景仁;利用软件多层次实现项目进度控制[J];施工技术;2005年02期
4 傅鸿源;李军;;从人出发分析工程项目进度控制[J];山西建筑;2008年06期
5 金立红;;住宅项目进度控制理论的探讨[J];今日科苑;2008年10期
6 库尔曼巴依;;建设工程项目进度控制[J];科技信息;2008年27期
7 刘昕冉;;工程类项目进度控制探讨[J];硅谷;2011年01期
8 杨雪飞;张春海;;浅谈工程项目进度控制[J];河南建材;2011年06期
9 任明;论项目进度控制优化[J];基建优化;1992年04期
10 杨义兵,曹小琳;工程项目进度控制目标的经济性分析[J];重庆建筑大学学报;2003年02期
相关会议论文 前4条
1 邵晓龙;李松涛;;工业建筑项目进度控制措施[A];河南省土木建筑学会2010年学术大会论文集[C];2010年
2 李松涛;邵晓龙;;工业建筑项目进度控制措施[A];土木建筑学术文库(第13卷)[C];2010年
3 刘志辉;赵秋玲;;浅谈房地产企业的项目进度控制[A];土木建筑学术文库(第15卷)[C];2011年
4 崔东红;孟娜;;基于TOC的项目进度控制[A];2006中国控制与决策学术年会论文集[C];2006年
相关重要报纸文章 前2条
1 王善龙;做好项目进度控制这道题[N];中国建设报;2014年
2 王志高;谭金生;陕西出台审计项目进度控制办法[N];中国审计报;2004年
相关硕士学位论文 前10条
1 董长华;ZP房地产项目进度控制研究[D];西南交通大学;2015年
2 王楠;J热电公司供热项目进度控制研究[D];山东大学;2015年
3 王冉;大兴区旧忠路3#标段项目进度控制研究[D];北京化工大学;2015年
4 李智勇;雅砻江流域开发卡杨公路项目进度控制研究[D];电子科技大学;2015年
5 张亮;基于网络计划技术的工程设计项目进度控制研究[D];河北工业大学;2015年
6 石方;CD移动TD-LTE项目实施中的进度与质量管理研究[D];电子科技大学;2014年
7 王淡奎;基于关键链的海关XX艇维修工程项目进度控制研究[D];华南理工大学;2015年
8 康亚庆;南京机场线车辆项目进度控制管理分析[D];南京财经大学;2014年
9 陈天龙;沈阳荣盛商业项目进度控制研究[D];吉林大学;2015年
10 王勇;TC公司总部异地搬迁项目进度控制研究[D];山东大学;2015年
,本文编号:2121176
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2121176.html