基于模糊模型的工程网络计划技术的算法研究

发布时间:2018-07-28 17:54
【摘要】:工程建设过程中的不确定性因素对预测工程建设工期有较大影响,同时也影响着工程网络计划工期计算的可靠性。现行的工程网络计划规范不能解决这些问题。文章采用模糊集合论的理论以及可能性测度法和一致性指数法研究工程网络计划技术并提出基于模糊模型的网络计划技术的计算方法,通过实例分析模型算法的正确性。研究结论表明基于模糊模型的工程网络计划技术的计算方法简明、数据易于实现计算机处理和软件化。
[Abstract]:The uncertain factors in the process of engineering construction have great influence on the prediction of the construction period, and also affect the reliability of the calculation of the project network planning period. The current project network planning specification can not solve these problems. In this paper, the theory of fuzzy set theory, the possibility measure method and the consistency index method are used to study the engineering network planning technology, and the calculation method of the network planning technology based on fuzzy model is put forward, and the correctness of the model algorithm is analyzed by an example. The research results show that the calculation method of engineering network planning technology based on fuzzy model is simple and the data is easy to be processed by computer and software.
【作者单位】: 三峡大学 三峡大学 三峡大学
【基金】:湖北省教育厅资助项目(2000B14003)
【分类号】:F224

【参考文献】

中国期刊全文数据库 前3条

1 刘新旺,达庆利;模糊关键路径的近似法[J];东南大学学报;1997年05期

2 郑峡龙,方子帆,赵彪;工程建设环境中不确定因素的模糊评价[J];人民长江;1998年09期

3 方子帆,郑霞忠,朱乔生;工程项目建设工期模糊性研究[J];三峡大学学报(自然科学版);2001年05期

【共引文献】

中国期刊全文数据库 前10条

1 张海涛;何亚伯;;一种新的模糊网络计算方法[J];四川建筑科学研究;2007年02期

2 赵海燕;傅s,

本文编号:2151140


资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2151140.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户fa1ab***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com