TJDY新厂搬迁项目进度管理研究
[Abstract]:TJDY Company is the first convenient food factory invested by th Group in China. It has established the first production line in Tianjin Development Zone in 1992 and now has 42 production lines. In 2013, it has become a large food production enterprise with an annual output value of 3 billion yuan. However, due to the scattered layout of the three plant areas, the existence of environmental protection problems and fire hazards, the limited introduction of new technologies and the low efficiency of management, this has hindered the development of enterprises. Meanwhile, in order to cooperate with the overall development policy of the development zone government and to enhance the corporate image of the group, To increase the market competitiveness, the group decided to locate the site of the new construction workshop, office building and supporting facilities at Mu-Ning Road, with two finished product warehouses, four noodle workshops, conditioning workshop, concentrate factory and PE barrel factory, covering a total area of about 200000 square meters. Using 19 new technologies to build a new Tianjin factory with an annual output of about 5 billion bales of instant noodles and an annual output value of 7.5 billion yuan. TJDY's new plant relocation project is the first relocation project in which the Group has invested in the mainland for more than a decade, and has received the attention of the group's executives at all levels. In the process of project implementation, the method and means of project management are applied, from the establishment of project ad hoc group to the division of labor of each responsible department, to the formulation of schedule plan and the control of schedule, etc. The relocation project went smoothly, but there are still many management flaws to be improved for a variety of reasons. The purpose of this project is to ensure the project to be completed smoothly and to provide valuable reference for the management of relocation projects in the same industry. Through organizing measures used in project schedule control, using project management tools such as WBS, responsibility matrix, Gantt chart and so on, this paper makes a feasible schedule, finds out all the work that can be carried out in parallel, and finds out the key path. Think ahead of time to solve the problem of insufficient resources for parallel work. In the project execution phase, according to the progress plan, the detailed work. Implement weekly, daily, biweekly and monthly report system to solve problems in time. Meet uncontrollable factor, adjust in time. Hold regular coordination meetings to inform all parts of the progress of the project, coordinate related issues, timely adjustment. Refine the responsibilities of each job before it begins. Timely report quality, progress, investment situation, easy for superior leaders to make decisions, solve the problems encountered in the progress of the project. Through the adoption of corrective measures and control measures to ensure the smooth realization of project objectives.
【学位授予单位】:河北工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU722
【相似文献】
相关期刊论文 前10条
1 ;2004年西部铁路主要建设项目与进度计划[J];铁路工程造价管理;2004年02期
2 郭莹;;重大科技项目的进度计划与控制分析[J];农电管理;2012年05期
3 张鹏;;进度计划优化软件在机械调配中的应用[J];科技情报开发与经济;2008年30期
4 方团团;;双代号进度计划在施工项目管理中的应用[J];浙江建筑;2009年07期
5 王华;;施工作业进度计划的编制和执行[J];中国科技信息;2009年22期
6 冀志斌;周永亮;王延平;;施工总承包进度计划的策划[J];工程建设与设计;2011年S1期
7 郝国鹏;吴文平;;谈施工阶段进度计划的对比与调整[J];水利与建筑工程学报;2011年05期
8 潘翠燕;张世伟;;进度计划的编制要点[J];河南建材;2011年06期
9 高伟;;浅谈建筑项目进度计划[J];安徽建筑;2012年02期
10 韩发忠;;探析建筑装饰中进度的控制[J];现代装饰(理论);2013年09期
相关会议论文 前1条
1 杨永丽;杨利利;;浅议建设工程编制进度计划与管理[A];土木建筑学术文库(第16卷)[C];2012年
相关重要报纸文章 前10条
1 张志伦;施工作业进度计划的编制和执行[N];建筑时报;2005年
2 常学武;水电四局漕河项目部奋力冲刺今年计划目标[N];中国水利报;2005年
3 本报记者 张旭;东北区域2012年电网建设里程碑进度计划评审会在沈召开[N];东北电力报;2011年
4 应宝夫 吕荣兴;项目进度、成本、质量、安全的控制[N];建筑时报;2006年
5 程锦;投资逾四千万改造市政设施[N];贵阳日报;2008年
6 田进波 王建新;浅议如何确保采办计划有效执行[N];石油管道报;2011年
7 实习生 徐艳梅;上半年:全市工业和技改投资增速远超全省平均水平[N];内江日报;2014年
8 通讯员 廖晓莉;市政府开展全市通过水泥路建设专项督查[N];安康日报;2006年
9 省交通运输厅党组书记、厅长 高烽;全过程全因素管理法:优化流程提高效率[N];四川日报;2010年
10 江泰;7亿千瓦标志性机组在这里诞生[N];中国电力报;2008年
相关博士学位论文 前2条
1 贾鹏;机械产品研发项目的进度计划管理研究[D];山东大学;2014年
2 李红仙;费用最低/收益最大条件下的工程项目动态进度优化研究[D];河海大学;2006年
相关硕士学位论文 前10条
1 阴旭娟;EPC模式下化工类项目的鲁棒进度计划研究[D];中国科学院大学(工程管理与信息技术学院);2015年
2 王莹;DP公司工业交换机研发项目的进度计划与控制[D];东北大学;2014年
3 韩金凤;500kW海洋能独立电力系统示范工程项目进度计划与控制研究[D];中国海洋大学;2014年
4 陈孚;大连港太平湾港区航道二期疏浚工程进度计划研究[D];中国海洋大学;2015年
5 王莹;S市滨河大道路灯工程项目进度管理研究[D];中国海洋大学;2012年
6 韩迟;G路桥项目施工进度管理与控制研究[D];西安工程大学;2016年
7 赵明;短期进度计划整体优化及在伊敏三号露天矿的应用[D];东北大学;2014年
8 左守秋;TJDY新厂搬迁项目进度管理研究[D];河北工业大学;2015年
9 李建成;施工项目中的进度计划与控制研究[D];上海交通大学;2007年
10 陈红杰;线状工程三种进度计划与优化方法研究[D];兰州交通大学;2013年
,本文编号:2187984
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2187984.html