轨道交通机电安装工程的设计变更研究
[Abstract]:The construction of urban rail transit in China is being carried out on a large scale. In order to provide passengers with a comfortable ride environment, the construction of rail transit engineering is emphasizing more and more humanized design. Ventilation and air conditioning, water supply and drainage, low voltage distribution are closely related to passenger comfort, and are paid more and more attention by construction units. The mechatronic installation (wind, water, electricity) project of rail transit project has many professional interfaces and complex construction conditions, which often leads to a large number of design changes, which greatly increases the investment of the owner and seriously affects the realization of project management objectives. There are many researches on the change management of rail transit project and mechatronic installation project at home and abroad. However, based on the actual cases, the quantitative analysis of the change problem of the mechatronic installation project of rail transit is rare. In this paper, Suzhou Rail Transit Line 1, 2 as the research object, mainly using the method of case analysis and questionnaire survey. First of all, this paper reviews the related literature at home and abroad, summarizes the existing research results of the design change of the mechatronic installation engineering of rail transit, and expounds the concept of the mechatronics installation engineering of the rail transit. Secondly, the design changes of mechanical and electrical installation of Suzhou Rail Transit Line 1 are analyzed statistically, and the management problems of the design changes of Suzhou Rail Transit Line 1 are revealed. By means of questionnaire survey, the authors investigated the designers of mechanical and electrical installation, and verified the statistical analysis conclusions of the design changes of Suzhou Rail Transit Line 1. Thirdly, combined with the results of investigation and statistics, this paper analyzes the management experience and measures of the design change of Suzhou Rail Transit Line 1 and 2. Finally, the design change times and the amount of money of Suzhou Rail Transit Line 1 and 2 are compared and analyzed to verify the effectiveness of the design change management measures. The results show that the low-voltage distribution engineering is the most prone to design change (53.1%) in the mechatronics installation project of rail transit. Design quality problem is the main reason for design change. The accuracy of interface data is the most important factor affecting the design quality (43.3%). In order to control the design change, the owner of Suzhou rail transit has adopted the professional interface that is clearly designed, established a reasonable design cycle, and strengthened the control measures such as drawing examination and technical understatement. It is proved by practice that the design change caused by the design quality problem of Line 2 has been effectively controlled in comparison with Suzhou Rail Transit No. 1. Among them, the number of mechatronic engineering design changes of Suzhou rail transit line 2 has decreased by 65.3and 65.3than that of Suzhou rail transit line 1, while the total design change of Suzhou rail transit line 2 is only 43.2 percent of Suzhou rail transit line 1. The research results of this paper have some limitations. In the course of the research, the author only collected more than 30 questionnaires, which can not reflect the overall opinions of the designers involved in the mechanical and electrical installation engineering of Suzhou rail transit. Which management measures most effectively control the design changes of Suzhou Rail Transit Line 2 without quantitative analysis. These will be further strengthened in future studies.
【学位授予单位】:苏州科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U231.3
【相似文献】
相关期刊论文 前10条
1 黄健;;论设计变更的管理[J];辽宁建材;2006年02期
2 李玉玲;;浅谈工程中的设计变更[J];黑龙江科技信息;2007年05期
3 杨瑞林;;浅谈如何加强设计变更的管理工作[J];山西建筑;2010年10期
4 于亮,王族友;高速公路设计变更的原因分析与对策[J];华东公路;2001年05期
5 李晓东;论设计变更管理[J];杭州科技;2002年04期
6 王家海;强化设计变更管理 控制铁路工程投资[J];铁路工程造价管理;2002年01期
7 郭铁惠;设计变更对高速公路施工阶段投资的影响[J];建设监理;2003年02期
8 张璞珍;;加强设计变更管理 提高建设项目效益[J];建设监理;2006年05期
9 朱艳丽;仇旭;;水利工程项目设计变更管理方式初探[J];吉林水利;2007年06期
10 魏兵;;论设计变更[J];商品与质量;2009年S3期
相关会议论文 前7条
1 周小娟;;浅谈在虹桥综合交通枢纽建设中的设计变更及其管理[A];上海空港(第10辑)[C];2009年
2 谭晓洪;魏蔚;;浅析业主方的设计变更管理[A];上海空港(第11辑)[C];2010年
3 金晶;;浅议设计变更与工程造价[A];2013年4月建筑科技与管理学术交流会论文集[C];2013年
4 杨金岭;;浅谈如何加强设计变更和工程签证的管理工作[A];河南省土木建筑学会2008年学术交流会论文集[C];2008年
5 党延芬;王洪武;;设计变更、现场签证对控制工程造价的影响[A];土木建筑学术文库(第15卷)[C];2011年
6 张胜强;张柏青;谢安健;;论工程项目质量控制要点[A];2010年度海洋工程学术会议论文集[C];2010年
7 荆常俊;姜春波;;基于施工阶段设计变更、洽商、现场签证造价控制探讨[A];2013年11月建筑科技与管理学术交流会论文集[C];2013年
相关重要报纸文章 前10条
1 记者 胡萍;渡改桥项目不得随意变更设计[N];江西日报;2009年
2 黄规;黄委加强基本建设投资计划管理和设计变更管理[N];黄河报;2013年
3 通讯员 李松柏;东中线一期工程设计变更管理研究报告通过评审[N];中国水利报;2008年
4 陈朝权;给违法设计变更“添堵”[N];中国建设报;2014年
5 本报记者 柏松;完成设计变更仅需一天[N];中国纺织报;2005年
6 本报记者 王曦;大数据时代,BIM设计的“八面玲珑”[N];中华建筑报;2014年
7 黄河;设计要精 投资更省[N];中国石化报;2001年
8 ;公路工程设计变更管理办法[N];中国交通报;2005年
9 钱新;向设计要质量[N];中国质量报;2011年
10 通讯员 王晓东 王项坤;乌什援疆指挥部制定投资项目设计变更管理办法[N];阿克苏日报(汉);2011年
相关博士学位论文 前1条
1 杨娟;基于云计算的设计服务模式研究及原型应用[D];重庆大学;2012年
相关硕士学位论文 前10条
1 张育鹏;基于C#的兆伏电子企业信息管理系统的设计与实现[D];吉林大学;2016年
2 孙迪文;设计变更对船舶建造材料成本的影响分析[D];江苏科技大学;2016年
3 余勇;BIM设计模式在华蓝公司中的应用探索[D];华南理工大学;2015年
4 池海;JDI化工装置项目设计变更风险管理案例研究[D];大连理工大学;2015年
5 王继锋;轨道交通机电安装工程的设计变更研究[D];苏州科技大学;2017年
6 姚建荣;公路跨越式发展建设时期项目控制管理及设计变更研究[D];长安大学;2010年
7 范光远;施工总承包方大型商贸项目设计变更管理研究[D];哈尔滨工业大学;2013年
8 张振炎;面向产品结构网络的设计变更研究[D];武汉科技大学;2014年
9 李华;JKS公司设计人员职业能力提升策略研究[D];吉林大学;2013年
10 董秋晓;K公司设计流程研究[D];厦门大学;2007年
,本文编号:2207145
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2207145.html