工程项目建设中文件管理应注意的问题
发布时间:2018-11-01 21:15
【摘要】:正在工程建设项目实施过程中,无论是会议、检查、谈判,还是研究、设计、审批,或者施工和交易,这些项目管理行为最终必须通过文件的形式确定下来,进行信息传递,得到确认和执行,从而实现对工程费用、质量、安全和进度等节点在时间、空间、数量、质量方面的多向量控制。项目实施各方的相互关系和合作内容也必须通过文件才能得到确定。因此,文件管理是项目管理的核心和驱动器。加强工程文件管理,确保工程项目中
[Abstract]:In the process of implementing a project, whether it is a meeting, an inspection, a negotiation, or a study, design, approval, or construction or transaction, these project management actions must eventually be determined in the form of a document for the transmission of information. It is confirmed and executed to achieve multi-vector control over the cost, quality, safety and schedule of the project in terms of time, space, quantity, and quality. The relationship and cooperation between the parties to the project must also be determined through documents. Therefore, file management is the core and driver of project management. Strengthening the Management of Engineering documents to ensure that the Engineering Project
【作者单位】: 铁岭市测绘管理办公室;
【分类号】:G271
,
本文编号:2305118
[Abstract]:In the process of implementing a project, whether it is a meeting, an inspection, a negotiation, or a study, design, approval, or construction or transaction, these project management actions must eventually be determined in the form of a document for the transmission of information. It is confirmed and executed to achieve multi-vector control over the cost, quality, safety and schedule of the project in terms of time, space, quantity, and quality. The relationship and cooperation between the parties to the project must also be determined through documents. Therefore, file management is the core and driver of project management. Strengthening the Management of Engineering documents to ensure that the Engineering Project
【作者单位】: 铁岭市测绘管理办公室;
【分类号】:G271
,
本文编号:2305118
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2305118.html