水利水电工程设计项目管理的实践与探索
发布时间:2018-11-19 17:12
【摘要】:项目管理作为与项目法人责任制相配套的项目管理模式已在我国的工程建设中得到广泛应用 ,工程设计作为工程建设的关键阶段之一 ,也必须推行项目管理 ,以提高设计单位的管理水平和市场竞争能力 ,满足工程建设的需要 .水利部上海勘测设计研究院自 1 998年 1月 1日起 ,全面试行工程设计项目管理 ,采用项目管理为中心、专业管理为基础的矩阵式结构管理模式 ,推行项目经理负责制 ,进行了 1年半时间的实践与探索 ,达到了预期的目的 ,为适应市场竞争的需要迈出了坚实的一步 ,但也存在着一些亟需探索、研究的问题 ,今后将通过不断总结经验 ,并逐步完善 ,为提高水利水电工程设计项目管理的水平贡献一份力量
[Abstract]:Project management has been widely used in our country as a project management mode which is matched with the project legal person responsibility system. As one of the key stages of engineering construction, project management must also be carried out. In order to improve the management level of design units and market competitiveness, to meet the needs of engineering construction. Since January 1, 1998, the Shanghai Survey and Design Research Institute of the Ministry of Water Resources has tried out the project design project management in an all-round way, adopting a matrix structure management model with project management as the center and professional management as the foundation, and carrying out the project manager responsibility system. After one and a half years of practice and exploration, we have achieved the desired goal and taken a solid step forward to meet the needs of market competition. However, there are still some problems that need to be explored and studied. In the future, we will continue to sum up experience and gradually improve the management of water conservancy and hydropower engineering design projects, contributing to the level of water conservancy and hydropower engineering design project management.
【作者单位】: 水利部上海勘测设计研究院!上海市 200434
【分类号】:TV222
[Abstract]:Project management has been widely used in our country as a project management mode which is matched with the project legal person responsibility system. As one of the key stages of engineering construction, project management must also be carried out. In order to improve the management level of design units and market competitiveness, to meet the needs of engineering construction. Since January 1, 1998, the Shanghai Survey and Design Research Institute of the Ministry of Water Resources has tried out the project design project management in an all-round way, adopting a matrix structure management model with project management as the center and professional management as the foundation, and carrying out the project manager responsibility system. After one and a half years of practice and exploration, we have achieved the desired goal and taken a solid step forward to meet the needs of market competition. However, there are still some problems that need to be explored and studied. In the future, we will continue to sum up experience and gradually improve the management of water conservancy and hydropower engineering design projects, contributing to the level of water conservancy and hydropower engineering design project management.
【作者单位】: 水利部上海勘测设计研究院!上海市 200434
【分类号】:TV222
【共引文献】
相关期刊论文 前3条
1 贺朝铸;环保工程总承包项目质量管理中存在的问题及对策[J];电力环境保护;2004年01期
2 林振华;现代设计院工程设计项目管理初探[J];林业调查规划;2003年01期
3 马斌,苗隆德,解建仓;高校基础设施建设投资经济效益分析[J];陕西工学院学报;2000年02期
相关硕士学位论文 前10条
1 梁永宽;从石化项目建设模式的发展探索西南管道工程建设管理[D];厦门大学;2001年
2 孙鸿文;JC集团多项目综合管理的实践与研究[D];哈尔滨工程大学;2002年
3 侯景亮;“阳光大厦”项目管理整体效能解决方案的研究[D];西南交通大学;2003年
4 亢文宇;工程建设项目的风险对策研究[D];大连理工大学;2003年
5 毕永明;烟建公司项目施工成本管理的研究[D];对外经济贸易大学;2004年
6 马明;武钢耐火公司重点投资项目的规划及财务评价[D];华中科技大学;2004年
7 周涛;建筑装饰工程项目施工成本管理的研究[D];对外经济贸易大学;2005年
8 谭俊;神华神东自备电厂交钥匙承包建设中总包方的人力资源优化管理[D];华北电力大学(北京);2006年
9 刘德举;广州石化炼油改扩建项目进度计划与控制[D];西南交通大学;2006年
10 幸pび,
本文编号:2342916
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2342916.html