变频器制造企业项目管理成熟度评价研究

发布时间:2018-11-29 09:03
【摘要】:全球能源消耗呈现爆发性增长趋势,而变频器在电能的利用过程中可以大量减少能源消耗,因此变频器制造企业应电力领域节能减排的需求而蓬勃发展起来。我国变频器制造企业普遍存在对项目管理技术与理念重视不足,应用低效的情况。因此,通过对变频器制造企业进行项目管理成熟度评价研究,从而提升企业项目管理能力和企业核心竞争力已经成为变频器制造企业的当务之急。 本文主要通过研究分析国内外项目管理成熟度的理论及模型,结合变频器制造企业具体特点,提出适合变频器制造企业的项目管理成熟度模型,并通过专家问卷调查的方法确定评价指标体系的关键要素及指标,将层次分析法和信息熵法相结合,以确定变频器制造企业项目管理的指标权重。运用基于灰色综合评判的项目管理成熟度指标分析评价方法,并针对企业具体案例进行实例分析,对所提出的项目管理成熟度评价模型进行应用研究。 本研究对变频器制造企业的矿山应用多传动变频调速系统项目进行项目管理实例分析研究。根据变频器制造企业现况,运用项目管理成熟度综合评价方法分析,得出所设计的项目管理成熟度模型及评价方法符合企业项目管理实际情况,可对变频器制造企业项目管理工作进行及时有效的管理和改进。
[Abstract]:The global energy consumption shows an explosive increasing trend, and the frequency converter can greatly reduce the energy consumption in the process of power utilization. Therefore, the inverter manufacturing enterprises develop vigorously according to the demand of energy saving and emission reduction in the field of electric power. The inverter manufacturing enterprises in our country pay less attention to the project management technology and concept, and apply low efficiency. Therefore, through the research on the project management maturity evaluation of inverter manufacturing enterprises, it has become an urgent task for inverter manufacturing enterprises to improve their project management ability and core competitiveness. In this paper, the theory and model of project management maturity at home and abroad are studied and analyzed, and the project management maturity model suitable for inverter manufacturing enterprises is put forward according to the specific characteristics of inverter manufacturing enterprises. The key elements and indicators of the evaluation index system are determined by the method of expert questionnaire, and the index weight of the project management of the inverter manufacturing enterprise is determined by combining the analytic hierarchy process (AHP) with the information entropy method. In this paper, the project management maturity index analysis and evaluation method based on grey comprehensive evaluation is used, and the project management maturity evaluation model is applied to the project management maturity evaluation model. In this paper, the project management example of multi-drive variable-frequency speed regulating system in the mine of frequency converter manufacturing enterprise is analyzed and studied. According to the current situation of inverter manufacturing enterprises, the project management maturity model and evaluation method are designed according to the project management maturity comprehensive evaluation method, which is in line with the actual situation of enterprise project management. Frequency converter manufacturing enterprise project management can be timely and effective management and improvement.
【学位授予单位】:中国科学院大学(工程管理与信息技术学院)
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.6

【参考文献】

相关期刊论文 前5条

1 潘星;王君;刘鲁;;航空制造企业知识管理能力评价案例研究[J];北京航空航天大学学报(社会科学版);2009年02期

2 彭理莉;王国顺;;企业知识管理能力成熟度评价模型的研究[J];长沙铁道学院学报(社会科学版);2007年01期

3 唐昌杰;李杰;方才桧;;国内外项目管理成熟度模型研究综述[J];法制与经济(下旬);2014年01期

4 白山稳;;基于灰色理论的企业知识管理能力评价研究[J];价值工程;2010年25期

5 张瑶;胥卫平;;基于知识管理的企业研发项目管理体系研究[J];技术与创新管理;2014年01期



本文编号:2364573

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2364573.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户aca7f***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com