ND核电有限公司ERP系统实施和应用研究
[Abstract]:3.11 after the Fukushima nuclear accident in Japan, the safety and quality of nuclear power have attracted the world's full attention, and the combination of the ERP system and the standard practice of the nuclear power industry can effectively regulate the maintenance, isolation, equipment management and engineering transformation of the nuclear power station, The core processes, such as experience feedback and document management, can fully improve the management level of nuclear power plants, ensure the safe and stable operation of power stations, and further enhance the public's confidence in the safe utilization of nuclear power plants. In this paper, a case study method combining theory with practice is adopted to study the ERP implementation project of ND Nuclear Power Company from the point of view of the business situation and organizational structure of the company and the necessity of the implementation of ERP. Combining with the characteristics of nuclear power industry consulting project and the project management capability benchmark, the author optimizes the selection method of implementing unit and project manager, and scientifically selects the implementing unit and project manager, and improves on the basis of ASAP methodology in project implementation. The project cycle is controlled at 6.5 months, and the project scope, project plan, achievement quality and training effect are effectively controlled and guaranteed by means of plan tracking, communication matrix, transformation management, training "3T" theory and so on. Finally, through the use of depth and data in the system, from the management benefits, economic benefits, social benefits and other aspects of the system application effect analysis, through the analysis of the overall application of the system in the domestic energy industry in the leading position. Through summing up, the beneficial management experience and practice of project management mode, transformation management, basic data collation, communication, training model and control project change are summarized, and the problems of imperfect management are exposed in the process of implementation. Reasonable suggestions are put forward to provide reference for the implementation of ERP in the same type of nuclear power plants.
【学位授予单位】:福建师范大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F270.7;F426.23;F426.61
【相似文献】
相关期刊论文 前10条
1 季文;项目成功的12个关键原则[J];技术与市场.园林工程;2004年06期
2 梁松波;项目管理专业基础概述[J];上海标准化;2005年10期
3 张海东;;“法人管项目”下的人资管理[J];施工企业管理;2012年05期
4 徐亮辉;;汽车零部件企业的项目管理成熟度模型研究[J];上海汽车;2012年12期
5 和宏明;论西方项目范畴[J];基建优化;1998年03期
6 赛云秀;;项目三大目标相互作用分析[J];建筑经济;2008年08期
7 利镇有;何继善;;项目业绩系统评价模型及其改良研究[J];中国工程科学;2011年08期
8 卢锡雷;;“法人管项目”利弊何在[J];施工企业管理;2012年05期
9 许心华,崔婷;前进中的中德合作山东粮援项目[J];山东水利科技;1998年03期
10 秦刚;;成功的项目管理事业[J];江西建材;2014年07期
相关会议论文 前10条
1 ;征集项目一览表[A];2010’第五届绿色财富(中国)论坛会刊[C];2010年
2 赵彬;焦书长;;“三次会议”制度推进项目稳步持续发展[A];河南省建筑业行业优秀论文集(2010)[C];2010年
3 刘中平;周甄;李亚玲;马韬;;项目团队组织、分工与工作模式[A];2013年中国航空学会管理科学分会学术会议论文集[C];2013年
4 陈登慧;郭红梅;;水土保持执法项目目标竞争岗位责任制的形成与效益分析[A];水土保持监督管理论文选编[C];2003年
5 冯亮;;用项目管理模式开展ICT外包服务项目[A];海南省通信学会学术年会论文集(2006)[C];2006年
6 盛汉滨;樊军;王纪泉;;杭甬高速公路项目目标可持续发展评价[A];第一届全国公路科技创新高层论坛论文集环保与可持续发展卷[C];2002年
7 纪存兴;;项目管理在原子能院核电项目中的应用研究[A];中国核科学技术进展报告(第二卷)——中国核学会2011年学术年会论文集第10册(核情报(含计算机技术)分卷、核技术经济与管理现代化分卷)[C];2011年
8 杨来成;唐慧中;;改革管理机制 搞好藉河项目建设[A];中国水土保持探索与实践——小流域可持续发展研讨会论文集[C];2005年
9 王作功;贾元华;李素芬;;高速公路项目目标持续性评价指标体系及方法研究[A];可持续发展的中国交通——2005全国博士生学术论坛(交通运输工程学科)论文集(上册)[C];2005年
10 袁伟峰;;基于WBS的项目挣值分析及其应用[A];2011年中国航空学会管理科学分会学术交流会议论文集[C];2011年
相关重要报纸文章 前10条
1 崔晶炜;如何确定项目目标?[N];中国计算机报;2004年
2 记者 庄启e,
本文编号:2379050
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2379050.html