郑州市陇海快速路一标段工程项目进度管理研究
[Abstract]:From the point of view of project schedule management carried out by project construction management units, this paper studies the preparation, control and adjustment of the progress plan in the construction stage of the first section of the Longhai Expressway project in Zhengzhou. This paper analyzes the management process of the project progress of the first section of Longhai Expressway. First of all, the paper analyzes the general situation of Longhai Expressway in Zhengzhou and the overall implementation plan of the project, defines the construction technology, and summarizes the relevant theories of modern project management. This paper introduces the general situation of the project and determines the goal and scope of the project. The project is decomposed by WBS (work decomposition structure) technique and the responsibility of each work is assigned. On this basis, the logical relationship and the duration of each process are determined, and the initial schedule of the project is worked out by using the network planning method, and the critical path and the corresponding time parameters are determined. Secondly, in order to ensure the effective implementation of the progress plan, the paper formulates the implementation measures of the progress plan, and formulates the progress assurance measures and schedule assurance system to ensure that the progress plan can effectively guide the construction. In the process of project implementation, a perfect organization is established, and the corresponding project schedule management procedure system is formulated. At the same time, the schedule assurance system and corresponding measures in the process of project implementation are clearly defined. Finally, in the process of project schedule control, the paper improves the feedback mechanism of project schedule control information, and makes a comparative analysis of the project schedule plan. When the schedule comparison finds that there is a deviation in the plan, the paper analyzes whether the deviation affects the critical path. Whether the time difference is greater than the total time difference, whether there is a deviation in the project, according to which the adjustment measures are taken to adjust the project schedule plan to ensure the realization of the expected goal of the schedule plan. Through research, this paper puts forward the basic method of schedule management in the construction phase of the first section of Longhai Expressway in Zhengzhou City, which has been directly applied to the Longhai Expressway Project in Zhengzhou City. At the same time, the progress management of similar road construction projects also has reference significance.
【学位授予单位】:西安工程大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U415.1
【相似文献】
相关期刊论文 前10条
1 梁礼方;;项目进度管理(下)[J];金融科技时代;2013年10期
2 刘耕,王学军;国内外项目进度管理的比较及建议[J];重庆交通学院学报;2003年S1期
3 章勇武,尤建新,黄力 ,马国丰;高速公路项目进度管理信息系统设计研究[J];上海管理科学;2005年05期
4 田丰春;;项目进度管理研究[J];中国科技信息;2008年14期
5 聂淑萍;高建民;;项目进度管理在国防科研项目管理中的应用探析[J];国防技术基础;2008年07期
6 刘晓东;;基于知识管理的工程项目进度管理持续改进研究[J];建筑经济;2009年05期
7 林进峰;;工程项目进度管理[J];广东建材;2009年11期
8 杨红霞;;项目进度管理方法研究[J];山西建筑;2010年29期
9 杜建峰;江文杰;;项目进度管理在公路施工建设中的意义及应用[J];中国新技术新产品;2010年21期
10 杨振鹏;;工程项目进度管理相关问题探讨[J];东北水利水电;2011年12期
相关会议论文 前3条
1 杨正茂;;维生素C质量升级项目进度管理研究[A];第十届沈阳科学学术年会论文集(农业科学与医药科学分册)[C];2013年
2 高华北;张花玲;周湘晖;黄曦;丁霞;王丽;鄢旭辉;严国兴;;甘特图在职业病危害评价项目进度管理中的应用[A];湖南省预防医学会劳动卫生专业委员会2008年学术交流会议论文集[C];2008年
3 孙慧;王丽华;;多层次模糊控制在工程项目进度管理中的应用[A];2005年中国机械工程学会年会论文集[C];2005年
相关重要报纸文章 前7条
1 彭洁;昆明办审计项目进度管理实现规范化[N];中国审计报;2013年
2 ;辽宁审计厅出台审计项目进度管理办法[N];财会信报;2010年
3 曹忻;云南省审计厅实行项目进度管理[N];中国审计报;2010年
4 项荣;深圳办加强审计项目进度管理[N];中国审计报;2012年
5 小城;辽宁出台审计项目进度管理办法[N];中国税务报;2010年
6 记者 李颖;增强藏区自我造血能力 助推藏区跨越发展[N];成都日报;2014年
7 通讯员 刘永良;双永高速永定段完成投资15亿元[N];闽西日报;2010年
相关博士学位论文 前2条
1 魏从刚;网络化协同制造项目进度管理技术研究[D];西北工业大学;2006年
2 张敏;项目进度管理的行为不确定性及其控制策略研究[D];华中科技大学;2011年
,本文编号:2381878
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2381878.html