基于BIM和精益建造的施工项目质量控制研究
[Abstract]:With the development of construction industry all over the world, construction project management has become a hot research field. Because of the direct impact of project cost and duration on the benefit, the related research is also more in-depth, but the quality of the project has become the focus of attention. Lean construction as a new theory in the construction industry, and BIM technology as a necessary technology for the contemporary construction industry reform, the combination of the two on the role of project construction is worth studying. The research results of this paper are mainly reflected in the following aspects: (1) on the basis of a comprehensive understanding of the theory and means of lean construction, the quality control methods in the traditional mode and the means of quality control under lean construction are compared. It is pointed out that in the traditional control methods, the work of each stage is separated, the information exchange is not sufficient, the phenomenon of waste is serious, and so on. (2) the research on the interaction between BIM technology and lean construction shows that there is a strong synergy between them. BIM technology is a necessary means to realize lean construction and maximize the value of lean construction. Visual management is very important for lean construction, and efficient quality control system is an indispensable part of lean construction management. (3) according to planner system theory, a Kanban BIM construction quality control system based on LPS theory is constructed. The system Kanban BIM quality control process is realized by main plan, forward plan, weekly plan, execution plan four layer quality control plan pull, combine the dynamic support of BIM database, establish the feedback system of quality control information. Continuous improvement of construction quality. For projects with large volume, high complexity, long construction cycle and high operational and maintenance requirements, The quality control system of Kanban BIM is suggested to adopt the IPD organization structure under SPE. (4) according to the construction quality control system of Kanban BIM, this paper chooses Foshan Fangfang Tower complex construction project to carry on the case simulation analysis. The application of Kanban BIM quality control system for projects with complex structure, difficult construction and strict quality requirements can ensure the quality requirements of high standard under lean construction and maximize the value of the project. The research results have certain reference value to improve the quality management level of the construction project, reduce the construction cost and enhance the value of the project.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU712.3;TU17
【相似文献】
相关期刊论文 前10条
1 蒋书鸿,苏振民;精益建造:一种先进的建造体系[J];基建优化;2004年03期
2 曹真;苏振民;;基于案例分析的精益建造应用实践研究[J];建筑经济;2008年10期
3 李明;李前进;刘芳;;精益建造中的施工质量控制模式初探[J];建筑经济;2009年06期
4 王伟伟;叶青;;精益建造管理模式应用研究[J];福建建筑;2010年03期
5 李霖;;基于精益建造模式下的施工质量控制问题探讨[J];河北企业;2011年06期
6 肖天明;;析北京奥运“绿色理念”与精益建造思想的互促性[J];基建管理优化;2010年02期
7 毛洪涛;程培育;王子亮;;基于精益建造的工程项目成本控制系统设计[J];财会通讯;2010年29期
8 于潺;刘立安;;精益建造实施难点与思路[J];北方交通;2013年S1期
9 于潺;;谈精益建造在高速公路建设中的意义[J];北方交通;2013年S1期
10 陈勇强;张浩然;;精益建造理论在工程项目管理中的应用[J];中国港湾建设;2007年04期
相关会议论文 前1条
1 李瑞进;陈勇强;汪智慧;;精益建造理论促进工程项目管理改进的研究[A];2005年中国机械工程学会年会论文集[C];2005年
相关重要报纸文章 前1条
1 吴忠良;BIM技术实现精益建造[N];建筑时报;2014年
相关博士学位论文 前1条
1 张园;住宅虚拟企业精益建造实施能力研究[D];天津大学;2012年
相关硕士学位论文 前10条
1 翟慧敏;精益建造在L施工项目管理中的运用研究[D];成都理工大学;2015年
2 石光胜;基于BIM和精益建造的施工项目质量控制研究[D];华南理工大学;2015年
3 冯仕章;精益建造及其应用研究[D];北京交通大学;2008年
4 王艳玲;基于精益建造的建筑施工项目成本管理研究[D];重庆大学;2014年
5 李瑞进;精益建造理论及其在工程项目中的应用研究[D];天津大学;2006年
6 王锐彦;基于供应链的建设工程项目精益建造管理研究[D];河北工业大学;2011年
7 邓斌;建筑工业化背景下的精益建造流程管理[D];华侨大学;2014年
8 蒙维娜;基于精益建造的铁路施工项目成本管理研究[D];西南交通大学;2012年
9 丁波涛;精益建造理论下的项目管理及决策评价方法[D];华南理工大学;2013年
10 赵帅;施工项目精益建造管理技术研究[D];长沙理工大学;2010年
,本文编号:2383224
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2383224.html