当前位置:主页 > 管理论文 > 项目管理论文 >

江垭水利枢纽工程世行贷款的项目准备和项目管理

发布时间:2019-02-21 19:11
【摘要】:江垭工程是湖南省最大的世行贷款水利项目。该项目的建设按世行导则进行国际公开竞争性招标, 用国际通用的 F I D I C 条款进行合同管理, 保证了工程质量、进度和费用的控制。通过江垭项目准备和项目管理的实践,, 更新了我们的管理观念, 提高了我们的项目管理水平, 有利于更快地与国际惯例接轨, 对我们今后的工程建设管理将产生积极而深远的影响。
[Abstract]:Jiangya Project is the largest World Bank loan water conservancy project in Hunan Province. The construction of the project is conducted according to the guidelines of the World Bank to conduct international open competitive bidding, and the international general F I D I C terms are used for contract management, which ensures the quality, schedule and cost control of the project. Through the practice of Jiangya project preparation and project management, our management concept has been updated, our project management level has been improved, and it is helpful to connect with international practice more quickly. It will have a positive and profound influence on our project construction management in the future.
【作者单位】: 水利部澧水流域水利水电综合开发公司!长沙 410007 水利部澧水流域水利水电综合开发公司!长沙 410007

【相似文献】

相关期刊论文 前10条

1 官垂英;农村经济要想活,个体贷款就得放[J];农村金融研究;1980年18期

2 ;发挥银行信贷杠杆作用 促进社队企业进行调整[J];农村金融研究;1980年23期

3 赵德安;对复州所社发放社员家庭付业贷款的调查[J];农村金融研究;1980年23期

4 杨杏生;目前社队企业存在的问题和银行信贷的改革[J];农村金融研究;1980年45期

5 ;桐乡县所属信用社发放社员个人建房贷款[J];农村金融研究;1980年46期

6 ;扩大贷款范围,搞活资金,扭亏为盈[J];农村金融研究;1980年47期

7 ;对“社队企业贷款办法”的几点看法[J];农村金融研究;1980年53期

8 姚维骥;对预购定金贷款的改革意见[J];农村金融研究;1980年63期

9 ;深入检查 总结教训[J];农村金融研究;1980年65期

10 朴灿寿;张增智;;发放社员贷款抓到点子上[J];中国金融;1980年04期

相关会议论文 前1条

1 徐左正;;国家开发银行贷款在上海市苏州河环境综合整治一期项目中的应用实践[A];首届九寨天堂国际环境论坛论文集[C];2005年

相关硕士学位论文 前9条

1 何浩;期房按揭贷款银行债权的风险分析及其法律保障[D];四川大学;2005年

2 郭子春;商业银行贷款风险的识别研究[D];西南交通大学;2005年

3 袁拓;论贷款诈骗罪[D];四川大学;2005年

4 景晓刚;国家开发银行甘肃省分行电力行业项目贷款风险分析与防范[D];兰州大学;2006年

5 张咏s

本文编号:2427808


资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2427808.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户91384***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com