高等院校世行贷款项目管理中存在的问题不容忽视
[Abstract]:First, the construction of the project has not strictly complied with the procedures of capital construction. For example, for a university's World Bank loan project-the scientific research building, the feasibility study report approved by the State Planning Commission is 5500 square meters in size and 5 million yuan in investment in construction, and the school adjusts its own construction scale to 6800 square meters according to its own needs. Total investment of 8.5 million yuan, and the actual construction scale of 7800 square meters, complete investment of 11 million yuan. Second, the arrangement of local matching funds is slow, the rate of capital arrival is low, and the progress of the project is slow. Fo
【作者单位】: 郑州特派办 郑州特派办
【分类号】:F239.22
【相似文献】
相关期刊论文 前10条
1 ;第五讲 贷款项目管理[J];投资研究;1986年09期
2 ;更改贷款项目管理的几点做法和体会[J];投资研究;1986年S2期
3 ;加强贷款项目管理 提高投资效益[J];中国金融;1986年08期
4 张国瑾;改革技改贷款项目管理的几点意见[J];武汉金融;1988年06期
5 方纲;技术改造贷款项目管理责任制初探[J];中国城市金融;1989年02期
6 张纯德;加强基层行处技改信贷管理之我见[J];中国城市金融;1989年12期
7 张敏生;;开展技改项目“三算”审查 提高贷款投资效益[J];金融与经济;1989年04期
8 金波;;项目评估中的八大问题及解决途径[J];现代金融;1989年07期
9 陈榕;要加强专项贷款管理[J];福建金融;1990年06期
10 陈石兴,刘登兴;调整信贷力度 增强应变能力[J];福建金融;1990年10期
相关重要报纸文章 前10条
1 国家开发银行昆明分行 马欣 赵铨;构筑投资银行业务体系[N];中国信息报;2001年
2 记者 严小娟;在我区建立高效流域管理组织[N];新疆日报(汉);2004年
3 ;富阳市积极探索政府负债管理[N];中国审计报;2005年
4 魏鑫;发挥金融职能作用 促农村经济发展[N];安徽经济报;2006年
5 王振湖 辛宏彪;咸安区强化世行贷款项目管理[N];中国审计报;2006年
6 本报记者 费杨生 申屠青南;外国政府贷款项目管理有新规[N];中国证券报;2006年
7 本报记者 王静琳 孙太e,
本文编号:2455726
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2455726.html