工程进度计划中的知识挖掘与应用
发布时间:2019-05-06 17:23
【摘要】:建设企业在工程实践中积累着大量历史项目的进度计划及管理文档资料,其中蕴含有丰富的工程经验和知识。受制于技术手段的不足,这些知识无法得到有效的识别和利用。该文基于图挖掘的理论,提出了一种能够从进度计划的网络图和Gantt图中识别出具有固定组合模式且频繁出现的工序集合的算法。试验测试和应用的结果表明,算法具有良好的可行性和有效性。算法的提出有助于项目管理人员从已有的进度计划中识别出有价值的信息和知识,为当前工程项目的计划制定和进度控制提供决策依据,以及为研究和开发工程进度管理和决策支持系统提供技术基础。
[Abstract]:Construction enterprises have accumulated a large number of historical project schedule and management documents in the engineering practice, which contains rich engineering experience and knowledge. Constrained by the lack of technical means, these knowledge can not be effectively identified and utilized. In this paper, based on the theory of graph mining, an algorithm is proposed to identify the set of processes with fixed combination pattern and frequent occurrence from the network graph and Gantt graph of schedule plan. The results of test and application show that the algorithm is feasible and effective. The proposed algorithm is helpful for project managers to identify valuable information and knowledge from the existing schedule, and to provide decision-making basis for current project planning and schedule control. And provide technical basis for research and development of project schedule management and decision support system.
【作者单位】: 清华大学土木工程系 清华大学土木工程系
【基金】:国家自然科学基金资助项目(50478015)
【分类号】:TU722
[Abstract]:Construction enterprises have accumulated a large number of historical project schedule and management documents in the engineering practice, which contains rich engineering experience and knowledge. Constrained by the lack of technical means, these knowledge can not be effectively identified and utilized. In this paper, based on the theory of graph mining, an algorithm is proposed to identify the set of processes with fixed combination pattern and frequent occurrence from the network graph and Gantt graph of schedule plan. The results of test and application show that the algorithm is feasible and effective. The proposed algorithm is helpful for project managers to identify valuable information and knowledge from the existing schedule, and to provide decision-making basis for current project planning and schedule control. And provide technical basis for research and development of project schedule management and decision support system.
【作者单位】: 清华大学土木工程系 清华大学土木工程系
【基金】:国家自然科学基金资助项目(50478015)
【分类号】:TU722
【参考文献】
相关期刊论文 前1条
1 胡作霆;董兰芳;王洵;;图的数据挖掘算法研究[J];计算机工程;2006年03期
【共引文献】
相关硕士学位论文 前2条
1 王利;Web使用挖掘方法及其在个性化学习系统中的应用研究[D];苏州大学;2006年
2 凌峰;公安系统行动技术支队查询系统分析设计[D];华东师范大学;2007年
【二级参考文献】
相关期刊论文 前1条
1 陈滢,王能斌;半结构化数据查询的处理和优化[J];软件学报;1999年08期
【相似文献】
相关期刊论文 前10条
1 赵令煌;;图像型火灾探测技术的应用[J];安防科技;2011年05期
2 ;[J];;年期
3 ;[J];;年期
4 ;[J];;年期
5 ;[J];;年期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
相关会议论文 前4条
1 胡宁;王翔;姚振汉;吴智深;;利用静态响应并结合频率测试数据进行结构损伤识别[A];第八届全国结构工程学术会议论文集(第Ⅰ卷)[C];1999年
2 熊孝波;桂国庆;郑明新;许建聪;马淑芝;;基于免疫RBF神经网络的深基坑施工变形预测[A];第二届中国水利水电岩土力学与工程学术讨论会论文集(一)[C];2008年
3 朱宏平;余t,
本文编号:2470360
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2470360.html