当前位置:主页 > 管理论文 > 项目管理论文 >

沪昆客专12标段工程施工组织与过程管理研究

发布时间:2019-05-09 12:54
【摘要】:我国正在形成全国性的高速铁路网络,沪昆客专经过了六个省会城市,是连通东、中和西部的重要高速大动脉,。沪昆客专12标段主要位于贵州省盘县境内,该工段地质情况复杂,对其施工过程进行管理研究是开展该施工的必要前提。施工组织设计是指导和组织施工的重要技术文件,也是开展监督检查、指挥生产建设的纲领,也对质量保证,工期保证具有重要意义。本文首先回顾了铁路施工项目管理的相关理论,从而为本文所开展的沪昆客专12标段施工管理提供了理论基础。在此基础上对沪昆客专12标段的实际情况进行论述,根据沪昆客专12标段的实际情况,设计了该工程的特点确定了施工组织结构,并对队伍部署和任务划分进行了详细探讨。接着对沪昆12标段项目的关键管理内容进行分析并制定具体管理措施,确保项目的顺利开展并达到既定目标。并对该攻宠的过程管理进行了详细分析。最后,经过详细分析制定了沪昆客专12标段施工管理的具体措施。针对质量管理、安全管理、工期控制管理及夏季雨季施工管理都制定了相应措施,进而确保项目的顺利开展。并制定了相关的预警机制。本文的研究为沪昆客专12标段施工提供了具体的指导措施,同时为该地区及同样地质条件下客运铁路施工提供了相关的借鉴经验。
[Abstract]:China is forming a national high-speed railway network, Shanghai-Kunming passenger College has passed through six provincial capitals, it is an important high-speed artery connecting the east, the middle and the west. The No. 12 section of Shanghai-Kunming passenger College is mainly located in Panxian County, Guizhou Province. The geological situation of this section is complex, so it is necessary to carry out the research on the management of the construction process. Construction organization design is an important technical document for guiding and organizing construction. It is also a program for carrying out supervision and inspection and directing production construction. It is also of great significance for quality assurance and time limit assurance. In this paper, the theory of railway construction project management is reviewed firstly, which provides a theoretical basis for the construction management of the 12-tendered section of Hukun passenger College developed in this paper. On this basis, this paper discusses the actual situation of the 12 bid section of Hukun passenger College, designs the characteristics of the project and determines the construction organization structure according to the actual situation of the 12 bid section of the Shanghai-Kunming passenger College, and discusses in detail the deployment of the team and the division of the tasks. Then the key management content of Shanghai-Kunming 12 section project is analyzed and specific management measures are formulated to ensure the smooth development of the project and to achieve the established goal. And the process management of the spoiled is analyzed in detail. Finally, the detailed analysis and formulation of the Shanghai-Kunming passenger College 12 construction management measures. According to the quality management, safety management, time limit control management and summer rainy season construction management, the corresponding measures are formulated to ensure the smooth development of the project. And set up the relevant early warning mechanism. The research in this paper provides specific guidance measures for the construction of the 12th section of Shanghai-Kunming passenger College, and also provides relevant reference experience for the construction of passenger railway in this area and under the same geological conditions.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U215.1

【参考文献】

相关期刊论文 前10条

1 郭峰;李体存;;铁路建设项目管理中的利益冲突与协调管理研究[J];铁道科学与工程学报;2008年06期

2 曹小琳,韩冰;工程项目管理目标系统的建立与控制[J];重庆大学学报(自然科学版);2002年07期

3 方圆;;我国公路工程、铁路工程及市政工程项目管理模式的对比分析[J];广东交通职业技术学院学报;2011年02期

4 马光远;;谈工程项目管理模式的应用[J];改革与开放;2010年24期

5 杨丁颖;黄建陵;;铁路工程项目管理体系框架模型研究[J];科技进步与对策;2011年13期

6 陆永坚;;工程项目管理模式发展探讨[J];科技信息(科学教研);2007年36期

7 李静;;就加强铁路桥梁施工项目管理的措施分析[J];科技与企业;2014年08期

8 周春清;周志东;;建立高效精干的工程指挥部,规范项目管理——青藏铁路19标段工程管理模式的探讨[J];四川水力发电;2005年S1期

9 严建渊,李林茂,毛存林;项目管理的基本理论与方法的应用研究[J];铁路计算机应用;2002年01期

10 安国栋;;中国高速铁路建设项目管理[J];中国铁路;2010年12期



本文编号:2472782

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2472782.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户bdc64***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com