贵阳中石化加油站工程合同管理系统的研究与分析
[Abstract]:In recent years, Sinopec is speeding up the comprehensive construction of enterprise informatization. Gas station construction, as the key construction project of capital construction department, should take the road of professional development not only in professional technology, but also in the corresponding project management, as well as many other factors, such as controlling safety, quality, capital cost and time limit in an all-round way. Under this background, in view of the fact that the current gas station engineering project contains many engineering projects and high safety measures, it is necessary to develop the contract management system software which is suitable for the application of the actual engineering environment and the development of the enterprise, in view of the high efficiency of development and advanced application performance, and the electronic contract management is the overall inevitable trend. After introducing the research background, project significance and current research and application status of Guiyang Sinopec Gas Station Engineering contract Management system, according to what I have learned in Yunda Software Engineering in the past three years, this paper analyzes and designs it from three parts: business analysis, function analysis and data analysis. In the part of business analysis, first of all, the existing organizational structure of PetroChina is analyzed. The organization structure diagram is given and the corresponding explanation is given. Secondly, the contract business process of traditional gas station engineering management is analyzed and shown in the form of business flow chart. Finally, the traditional contract business process is reorganized, which is displayed in the form of flow chart from four aspects: contract preparation, contract conclusion, contract performance and contract termination. In the part of functional analysis, first of all, the main roles of the system are analyzed. There are four roles in the system: contract manager, contract review approver, contract maintenance agent and project information maintainer. Secondly, the data flow analysis of each module of the system is carried out in the form of data flow graph. Finally, the function structure of the system is introduced in the form of total score, which is divided into four modules: contract preparation, contract conclusion, contract performance and contract termination. In the part of data analysis, the entity relationship model of the system is constructed, and then the database table in the system is introduced accordingly.
【学位授予单位】:云南大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TP311.52
【相似文献】
相关期刊论文 前3条
1 王代兵;佟曾;;基于BIM的工程合同管理应用研究[J];建筑与预算;2014年03期
2 杨赞锋,陈宁;道路工程合同管理信息编码设计[J];交通科技;2001年03期
3 ;[J];;年期
相关会议论文 前3条
1 苗宏胜;李向战;王继红;;加强工程合同管理与合理控制工程造价[A];河南省建筑业行业优秀论文集(2009)[C];2009年
2 李华伟;姜明;;浅谈施工单位工程合同管理[A];土木建筑学术文库(第15卷)[C];2011年
3 全宗国;;水利枢纽混凝土工程合同管理与投资控制浅析[A];2007年湖南水电科普论坛论文集[C];2007年
相关重要报纸文章 前10条
1 特约记者 韩庆文;工程“双保险”建设需提速[N];建筑时报;2002年
2 朱骏;工程合同管理中的风险防范[N];中华建筑报;2010年
3 旬阳卷烟厂副厂长 赵启斌;优良工程是管理出来的[N];厂长经理日报;2001年
4 记者 滕礼邋实习生 肖晓峰;市造价站积极参与地震灾区援建工作[N];深圳特区报;2008年
5 王永富 朱俊官;坚持用科学发展观推进交通基础设施建设[N];江苏经济报;2009年
6 柳苇;JCT将介入工程合同管理[N];中国建设报;2002年
7 记者 席晶;水利部完成三年清欠工程款目标[N];中国水利报;2007年
8 记者 耿庆海 通讯员 张殿方;山东“首接负责制”治理欠薪见成效[N];中国建设报;2013年
9 周建国;昆山高标准完成对口援川任务[N];中国财经报;2010年
10 毕林华;腾冲启动今年一期烟水工程项目[N];中华合作时报;2007年
相关硕士学位论文 前5条
1 陈旋;施工企业的工程合同管理系统的分析与设计[D];云南大学;2014年
2 戴克;济南卷烟厂易地技术改造项目工程合同管理研究[D];哈尔滨工程大学;2011年
3 张丹;基于J2EE架构的丹大高铁工程合同管理系统的设计与实现[D];大连交通大学;2014年
4 曹敏;基于知识管理的电力工程合同管理研究[D];华北电力大学;2013年
5 韦会源;贵阳中石化加油站工程合同管理系统的研究与分析[D];云南大学;2015年
,本文编号:2508190
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2508190.html