装配整体式综合管沟的试验及理论研究

发布时间:2018-01-10 23:13

  本文关键词:装配整体式综合管沟的试验及理论研究 出处:《山东大学》2017年硕士论文 论文类型:学位论文


  更多相关文章: 装配整体式综合管沟 接头 结构设计 工程应用 抗弯试验 有限元模拟 理论计算


【摘要】:综合管沟作为一种集约型、可持续化的管线敷设方式,可有效避免城市道路频繁开挖,并能延长管线使用寿命。现有综合管沟的施工方式主要为现浇与全预制拼装两种,均存在着基坑开挖量大、回填量高的问题。考虑到叠合结构具有现浇与预制的双重优点,本文将其引入综合管沟,提出一种新型管沟形式—装配整体式综合管沟,并对其接头力学性能进行了深入研究。此种新型综合管沟的预制构件可形成基坑支护体,避免基坑大开挖与回填。主要研究内容及成果如下:(1)参照规范,设计了—种新型装配整体式综合管沟。该管沟的预制构件为带外伸平板的预制管节,接头处采用预制外伸平板与现浇混凝土相结合的连接方式;对接头连接构造进行了重点设计,保证了接缝处的承载能力与防水性能;给出了采用非拼接型预制管节的装配整体式综合管沟的设计方法:使用阶段进行整体管沟的计算,施工阶段进行预制U型外伸平板的验算。(2)结合工程实例,进行了现浇综合管沟、全预制拼装综合管沟、装配整体式综合管沟的设计;并对三种综合管沟的施工成本进行了分析与比较,结果表明:装配整体式综合管沟的成本最低,可比现浇综合管沟节省22%。(3)对装配整体式综合管沟接头进行了抗弯性能试验,得到了装配整体式板受弯过程中的破坏形态、抗弯承载力、荷载-挠度曲线、应变变化等;与现浇混凝土板相比,装配整体式板的抗弯性能较差,但仍然具有一定的延性,可满足一定的承载力要求。(4)通过有限元软件ABAQUS对装配整体式板的抗弯性能试验进行了数值模拟,弹性阶段模拟结果较为准确,塑性阶段模拟值与试验值误差较大。参数分析表明,提高混凝土强度等级、减少连接缝宽度、降低预留外伸平板厚度可增加装配整体式板的抗弯刚度。(5)根据试验现象以及弹性阶段有限元分析结果,将装配整体式板转化为等效变截面板进行装配整体式板抗弯承载力及挠度的计算,计算值与试验值较为吻合,误差小于15%。
[Abstract]:As a kind of intensive and sustainable pipeline laying, comprehensive pipe trenches can effectively avoid frequent excavation of urban roads. And can prolong the service life of pipelines. The existing comprehensive pipe trench construction methods are mainly cast-in-place and fully prefabricated assembly, there is a large amount of excavation foundation pit. Considering the double advantages of cast-in-place and prefabrication of superimposed structure, this paper introduces it into comprehensive pipe ditch, and puts forward a new type of pipe ditch form-assembly integrated pipe ditch. The mechanical properties of the joints are studied in depth. The prefabricated members of this new comprehensive pipe trench can form the foundation pit support body to avoid large excavation and backfill. The main research contents and results are as follows: 1) reference specification. A new type of assembly integrated pipe groove is designed. The prefabricated member of the pipe ditch is a prefabricated pipe segment with an outstretched plate, and the connection mode between the prefabricated outstretched plate and the cast-in-place concrete is adopted at the joint. The key design of the joint connection structure is carried out to ensure the bearing capacity and waterproof performance of the joint. In this paper, the design method of integral integrated pipe trench with non-spliced prefabricated joints is presented: the calculation of integral pipe ditch is carried out in the stage of use. In the construction stage, the checking calculation of prefabricated U-shaped outstretched flat plate is carried out. Combining with the engineering example, the design of cast-in-place comprehensive pipe ditch, fully prefabricated integrated pipe ditch and integral integrated pipe ditch are carried out. The construction cost of three kinds of integrated pipe trench is analyzed and compared. The result shows that the cost of assembling integral integrated pipe ditch is the lowest. Compared with cast-in-situ comprehensive gutter, the bending behavior of the integrated pipe joint was tested, and the failure pattern and bending capacity of the integral plate were obtained. Load-deflection curve, strain variation, etc. Compared with cast-in-place concrete slabs, the bending resistance of assembled monolithic slabs is poor, but it still has a certain ductility. The flexural behavior test of assembled integral plate is simulated by finite element software ABAQUS. The simulation results of elastic stage are more accurate. The parameter analysis shows that the strength grade of concrete is improved and the width of joint is reduced. The bending stiffness of the assembled monolithic plate can be increased by reducing the thickness of the reserved extension plate.) according to the experimental phenomena and the results of finite element analysis in elastic stage. The bending bearing capacity and deflection of the assembly integral plate are calculated by transforming the assembly integral plate into an equivalent variable section plate. The calculated value is in good agreement with the experimental value, and the error is less than 15.
【学位授予单位】:山东大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU990.3

【相似文献】

相关期刊论文 前10条

1 黄新天;浅谈小区综合管沟的设计与应用[J];给水排水;2001年04期

2 王恒栋,王梅;综合管沟工程综述[J];上海建设科技;2004年03期

3 李家康;综合管沟在市政道路中的应用[J];建材技术与应用;2005年04期

4 莫艳玲;;浅谈市政综合管沟的防水构造[J];广东土木与建筑;2005年12期

5 王璇;陈寿标;;对综合管沟规划设计中若干问题的思考[J];地下空间与工程学报;2006年04期

6 孟广明;王伟;;综合管沟在青岛市的开发应用探讨[J];青岛理工大学学报;2006年05期

7 畅芬叶;;综合管沟的设计探讨[J];山西交通科技;2006年06期

8 黄国庆;;综合管沟电气设计[J];山西建筑;2007年03期

9 薛伟辰;胡翔;王恒栋;;综合管沟的应用与研究进展[J];特种结构;2007年01期

10 邱永钦;;浅谈综合管沟施工质量控制[J];山西建筑;2007年15期

相关会议论文 前6条

1 武云甫;檀星;王燕敏;;综合管沟规划建设刍议[A];城市规划面对面——2005城市规划年会论文集(下)[C];2005年

2 陈勇;徐园生;蔡敏翔;;浅谈城市地下综合管沟的发展与应用[A];江苏省测绘学会2011年学术年会论文集[C];2011年

3 丁晓敏;张季超;许勇;朱超;;广州大学城综合管沟应用实践研究[A];第18届全国结构工程学术会议论文集第Ⅱ册[C];2009年

4 王恒栋;王建;祁峰;;广州大学城综合管沟工程介绍[A];城市地下空间开发与地下工程施工技术高层论坛论文集[C];2004年

5 宋宏伟;;试论城市新区建设综合管沟的必要性——以哈尔滨市群力新区为例[A];规划50年——2006中国城市规划年会论文集(下册)[C];2006年

6 王刚;张超;胡伟耀;许宝根;;多脉冲电渗透技术在地下综合管沟防水中的应用[A];中国土木工程学会隧道与地下工程分会防水排水专业委员会第十五届学术交流会论文集[C];2011年

相关重要报纸文章 前10条

1 记者 彭磊 通讯员 叶火生;武汉将推广地下综合管沟[N];湖北日报;2010年

2 本报记者 崔武;高新区公用事业服务中心主任刘松代表:高新区综合管沟解决道路拉链问题[N];青岛日报;2011年

3 记者 王宝松;河北试点地下综合管沟建设[N];中国建设报;2011年

4 记者 韩红新;新城区花3.36亿敷设综合管沟[N];兰州日报;2006年

5 温勇立 李灵婕;涞源建民心工程促三年大变样[N];保定日报;2008年

6 记者 杨明清;青岛高新区道路50年不用“拉链”[N];工人日报;2010年

7 记者 张清华;地下管沟可容卡车通过[N];深圳商报;2010年

8 记者 曹丽娟 李文亮;涞源建成31公里地下综合管沟[N];河北日报;2011年

9 广东建设报见习记者 陈智莉 通讯员 张其明;广东试行“地下综合管沟”建设[N];广东建设报;2011年

10 记者 徐晓俊;综合管沟市场化运作之困[N];昆明日报;2012年

相关硕士学位论文 前10条

1 梁伟;复杂地质条件下综合管沟结构补强与渗漏治理的研究[D];烟台大学;2010年

2 陈只兵;综合管沟消防设计分析[D];华南理工大学;2013年

3 李熙;广州中新知识城综合管沟工程项目管理研究[D];西安建筑科技大学;2014年

4 宋庆晓;综合管沟建设管理方式方法的初步探究[D];青岛理工大学;2015年

5 夏鹏;软弱地质条件下的综合管沟沉降数值模拟与控制[D];武汉轻工大学;2015年

6 马素;装配整体式综合管沟的试验及理论研究[D];山东大学;2017年

7 李文婷;综合管沟电缆火灾数值模拟研究[D];首都经济贸易大学;2012年

8 陈明辉;城市综合管沟设计的相关问题研究[D];西安建筑科技大学;2013年

9 王东林;深圳市光明新区综合管沟项目成本控制优化研究[D];湘潭大学;2014年

10 胡雄;武汉CBD综合管沟项目风险管理研究[D];华中科技大学;2007年



本文编号:1407176

资料下载
论文发表

本文链接:https://www.wllwen.com/jianzhugongchenglunwen/1407176.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户7dcfc***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com