CAP1400核电站CA03模块最优吊点选择与分析
本文关键词: CAP 最优吊点 CA模块 有限元分析 出处:《施工技术》2017年S1期 论文类型:期刊论文
【摘要】:CAP1400核电站CA03模块是大型圆弧形钢结构,质量和体积大,整体刚度小,在吊装过程中容易发生变形。针对以上难点,制定了吊装方案,运用ANSYS软件对CA03模块的吊装进行了对比计算,分析采用不同吊点组合时CA03模块应力和位移的变化趋势及吊梁的受力情况,从而得到最大应力、最大位移以及吊梁受力的对比数据,选出最优吊点。
[Abstract]:CAP1400 nuclear power plant CA03 module is a large circular steel structure with large mass and volume, small overall stiffness and easy deformation during hoisting. In view of the above difficulties, the lifting scheme is established. By using ANSYS software, the hoisting of CA03 module is compared and calculated, and the changing trend of stress and displacement of CA03 module and the stress of the suspension beam are analyzed when different lifting points are adopted. The comparison data of maximum stress, maximum displacement and beam force are obtained, and the optimal lifting point is selected.
【作者单位】: 大连益利亚工程机械有限公司;中国核工业二三建设有限公司;
【分类号】:TM623;TU758.11
【正文快照】: 0引言CAP1400核电机组是在吸收世界先进核电技术的基础上,通过再创新开发出具有我国独立自主知识产权、功率更大的非能动大型先进压水堆核电机组,机组单机发电功率150万k W,设计寿命60年[1]。CA03模块是CAP1400安全壳内置换料水贮存箱的重要组成部分,是由双相不锈钢、碳钢、型
【相似文献】
相关期刊论文 前10条
1 裴碧峰;四吊点平衡架的革新[J];施工技术;1994年06期
2 滕先强;;力矩平衡原理在施工中的应用[J];科技风;2009年08期
3 王福绵;;长大构件吊装吊点的优化选择计算[J];起重运输机械;2013年04期
4 苏红霞;吴植武;;吊点激励作用下平面摆与锥摆运动摆角频率研究[J];四川建筑科学研究;2011年04期
5 俞剑江;;AP1000长管道模块吊装吊点的优化选择[J];工程建设与设计;2013年11期
6 贾斌;张其林;韩淼兵;陈海洲;谢刚奎;;柔性提升系统提升下吊点的有限元分析及试验研究[J];建筑技术;2013年04期
7 张晓光;曹爽秋;郑子辉;陈茂;郭家云;;网架吊装一钩多吊点方案研究[J];钢结构;2012年S1期
8 张长荣;朱新生;魏福祥;;900吨提梁机3吊点起升方案设计[J];建筑机械化;2007年03期
9 罗尧治,王轶,沈雁彬,胡宁;网壳结构“折叠展开式”施工吊点同步控制研究[J];施工技术;2004年11期
10 刘林;吴晓玉;王明阳;;拱形组板最佳吊点的选择[J];建筑工人;2001年12期
相关会议论文 前1条
1 孙明尧;;一种超高扬程起重设备多吊点同步调节方法[A];物流工程三十年技术创新发展之道[C];2010年
相关硕士学位论文 前4条
1 李浩;大吨位钢结构多吊点非对称整体提升中姿态控制技术研究[D];长沙理工大学;2015年
2 陈博文;大跨度钢结构吊点优化研究[D];大连理工大学;2011年
3 夏勇;大吨位钢结构多吊点非对称整体提升施工控制技术研究[D];长沙理工大学;2013年
4 雷旭;大跨度钢结构吊点布局研究[D];大连理工大学;2012年
,本文编号:1465558
本文链接:https://www.wllwen.com/jianzhugongchenglunwen/1465558.html