当前位置:主页 > 科技论文 > 建筑工程论文 >

海南昌江核电泵房进水方案介绍及经验总结

发布时间:2018-01-27 11:57

  本文关键词: 核电 PX泵房进水 进水方案 经验总结 关键路径 出处:《给水排水》2017年S2期  论文类型:期刊论文


【摘要】:海南昌江核电1#、2#机组是2台二代压水堆改进型机组,其PX泵房进水标志着核岛工艺系统调试全面正式铺开,是海南核电按期发电的基础,因此制定合理可行的进水方案十分重要。重点介绍了PX进水方案,并对进水过程中出现的问题进行了分析总结,希望对后续其他核电项目泵房进水的施工提供一些参考经验。
[Abstract]:Hainan Changjiang Nuclear Power Plant No. 1 #y2# unit is two second-generation pressurized water reactor improved units, its PX pump room water intake marks the full commissioning of the nuclear island process system, which is the basis of Hainan nuclear power generation on schedule. Therefore, it is very important to establish a reasonable and feasible influent scheme. The PX influent scheme is introduced emphatically, and the problems in the process of influent are analyzed and summarized. It is hoped to provide some reference experience for the construction of water intake in pump house of other nuclear power projects.
【作者单位】: 中国核电工程有限公司;
【分类号】:TU991
【正文快照】: 1 概述为了保证海南昌江项目1#机组泵房进水计划目标的顺利实现,制定可行合理的PX泵房进水方案尤为重要。进水方案中必须明确泵房进水路径,确定实施步骤,全面考虑实施过程中可能出现的风险,并制定相应的防范措施,才能确保泵房进水范围内所有施工工作顺利进行。本文将重点介绍

【相似文献】

相关期刊论文 前2条

1 ;翻新在于细节,自己动手不马虎[J];租售情报.装修情报;2013年06期

2 黄东义;吴毓仪;熊咏梅;;广东省绿道发展的经验[J];园林;2013年04期



本文编号:1468418

资料下载
论文发表

本文链接:https://www.wllwen.com/jianzhugongchenglunwen/1468418.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户8cfe1***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com