【摘要】:近年来,由于中国市场经济的不断成熟和城镇化的迅速发展,房地产投资占GDP的比重从2003年的7.39%上升到2015年的14.18%。急剧增加的资本投入使得房地产开发热度高烧不止。但是,现有的房地产项目建设,大多缺少统一、规范的评估监测体系,同时也缺乏科学的项目管理制度以及严格规范的审查改进程序,从而导致许多项目建设完成之后达不到预期目标、项目评估监测结果实质作用甚微。此外,我国的房地产项目后评价不论是实践中还是理论研究上都还不够完善,存在理论分析与实际需要脱节的现象。为此,本文拟在已有的项目后评价相关理论和方法基础上,设计出符合实际的项目后评价体系,从而丰富项目评价理论、增加实践可行度。本文对现有的项目后评价理论及方法做了回顾,总结出国内现有项目后评价工作存在的问题。论文构造了针对于A房地产项目的评价指标体系,将目标评价、过程评价有效结合,采用层次分析法和专家打分法计算出各级指标的权重;分析了该项目的工作情况、管理过程和管理特点,及该项目中各项指标的实际情况,有助于后文专家给出每个指标的评语;通过模糊综合评价法计算得到A房地产项目后评价的评价结果,并据此分析出A房地产项目管理过程中存在的问题以及今后改进的方向。经过层次分析法、德尔菲法以及模糊综合评模型的三者结合计算,得到北京市A房地产项目“良好”的评价结果,并指出该项目管理仍具有提升的空间。论文结束时对A公司及今后的房地产项目建设提出了具有参考价值的建议,如改进项目设计管理模式,明确相关专业工程施工图设计标准,多方调研后再选择施工单位,从而减少工程项目成本等等。
[Abstract]:In recent years, due to the continuous maturity of China's market economy and the rapid development of urbanization, the proportion of real estate investment in GDP has risen from 7.39% in 2003 to the increase of 14.18%. in 2015, which makes the heat of real estate develop high fever. However, the existing construction of real estate projects is mostly lack of unified and standardized evaluation monitoring body. At the same time, there is also a lack of scientific project management system and strict standard review and improvement procedures, which leads to the lack of expected goals after the completion of many projects. In addition, the post evaluation of real estate projects in China is not perfect, both in practice and in theoretical research. On the basis of the related theories and methods of the existing project post evaluation, this paper designs a project post evaluation system which is in conformity with the actual project, thus enriches the theory of project evaluation and increases the practical feasibility. This paper reviews the existing theory and methods of the evaluation of the post evaluation price of the project, and summarizes the present situation in China. The paper constructs the evaluation index system for the A real estate project, which combines the target evaluation and the process evaluation effectively, uses the analytic hierarchy process and the expert scoring method to calculate the weight of the indexes at all levels, analyzes the work situation, the management process and the management characteristics, and the indexes in the project. The actual situation is helpful for the post experts to give the evaluation of each index. Through the fuzzy comprehensive evaluation method, the evaluation results of the post evaluation of the A real estate project are calculated. According to this, the problems in the A real estate project management process and the direction of the future improvement are analyzed. After the analytic hierarchy process, Delphy Fa and the fuzzy comprehensive evaluation model The three parties, combined with the calculation, obtained the "good" evaluation results of the A real estate project in Beijing, and pointed out that the project management still has a room for improvement. At the end of the paper, it puts forward some suggestions on the construction of A and future real estate projects, such as improving the project design management model, and making clear the design of the relevant professional engineering construction drawings. Standards, multi - research and then choose the construction unit, so as to reduce the project cost and so on.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU71

【参考文献】

相关期刊论文 前10条

1 李雅琴;;工程建设投资项目经济评价方法及应用研究——以合肥乌鲁木齐路油气合建站为例[J];上海煤气;2014年02期

2 崔建国;林泽力;吕瑞;蒋丽英;齐义文;;基于模糊灰色聚类和组合赋权法的飞机健康状态综合评估方法[J];航空学报;2014年03期

3 张海军;施颖;李睿;;项目后评价理论及方法探讨[J];商业时代;2012年28期

4 朱明琪;张卓然;周航;;基于模糊数学的光伏发电综合效益评价[J];科技风;2011年11期

5 郭毅;;基于价值链的质量成本控制研究[J];经济论坛;2010年01期

6 施骞;徐莉燕;;绿色建筑评价体系分析[J];同济大学学报(社会科学版);2007年02期

7 白鸿莉;开展水利工程建设项目后评价的意义[J];山西水利科技;2004年01期

8 黄德春,许长新;投资项目后评价的现有理论及评析[J];河海大学学报(自然科学版);2003年06期

9 金菊良,魏一鸣,付强,丁晶;农业生产力综合评价的投影寻踪模型[J];农业系统科学与综合研究;2001年04期

10 冯圣洪,周心权;一种综合评价指标属性值规一量化技术新途径[J];系统工程学报;2000年02期

相关博士学位论文 前1条

1 李伯含;中国房地产业的市场结构与竞争行为研究[D];中共中央党校;2006年

相关硕士学位论文 前9条

1 邹兵;项目后评价理论在电力工程建设中的应用研究[D];吉林大学;2016年

2 张国辉;分布式光伏发电项目后评价研究[D];华北电力大学;2015年

3 王颖;项目后评价理论与案例分析[D];昆明理工大学;2014年

4 吴勇;保障性住房项目后评价研究[D];武汉理工大学;2013年

5 马超;政府公路投资项目后评价研究[D];东北石油大学;2013年

6 陈媛媛;政府投资项目后评价管理研究[D];上海师范大学;2013年

7 杨婧;住宅房地产项目后评价方法研究[D];武汉理工大学;2012年

8 王萍;浙江省水利项目后评价指标体系和方法研究[D];浙江大学;2006年

9 李政;房地产投资项目经济评价指标与方法探讨[D];中国社会科学院研究生院;2002年



本文编号:2143302

资料下载
论文发表

本文链接:https://www.wllwen.com/jianzhugongchenglunwen/2143302.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户2bd05***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com