基于PDA的电力工程施工质量信息采集系统构建与开发
[Abstract]:The deepening of electric power system reform in our country will bring more and more electric power construction projects. Because of its outstanding industry characteristics, power engineering construction quality management is more difficult for project managers. As the data source of construction quality real-time monitoring, construction quality information is the basis of engineering quality management. The authenticity and timeliness of the information directly affect whether the project construction objectives can be successfully realized. However, in the current power engineering construction project production practice, the lack of timely and effective construction quality information collection, it is difficult to accurately control the dynamic changes in the construction process. Therefore, in order to facilitate engineering managers to obtain construction information in real time and control the construction status, this paper takes the theory and practice of power engineering information management as the background, modern information technology as a means, The construction and development of power engineering construction quality information collection system based on PDA are carried out. This paper draws lessons from the advanced ideas and methods of domestic and foreign scholars on the research of information management of construction projects, and relies on the theory of power engineering quality management, the thought of informatization and information technology. This paper discusses the problems existing in the information management of electric power engineering projects. Then, from the point of view of the participants in the power engineering, the paper analyzes the system requirements, and takes the information construction system of power engineering as the design background, the system function modules, the overall framework of the system. The system server architecture and the system client architecture are designed in four parts. Then, combined with the system requirements and system functions, the construction quality information collection index system and system database are constructed. Finally, according to the system design, in the Android Studio development environment, using the Java object-oriented modular structure, using J2SE and Android SDK as the platform to develop and implement the system, which includes project selection, project participants, construction information collection. The whole process of the development of power engineering construction quality information collection system which is composed of seven modules of evaluation information collection, quality standard, personal setup and system management. The power engineering construction quality information collection system constructed in this paper can realize the real-time collection of construction quality information and engineering evaluation information on the spot of hand-held intelligent mobile terminal equipment, and quickly inquire the construction quality acceptance standard. By using mobile communication network to quickly publish construction information data and to carry out GPS real-time engineering positioning functions, users can flexibly and conveniently collect and manage construction information. To realize the centralized management and sharing of construction information efficiently. The application of the system can promote the progress of the traditional construction quality management technology and improve the management efficiency. It has a certain reference value for the improvement of power engineering construction quality monitoring level.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU712.3
【参考文献】
相关期刊论文 前10条
1 张楠;;基于移动终端的工程质量安全信息采集系统开发及应用[J];施工技术;2016年18期
2 王文国;;建设工程质量检测监管信息化标准体系研究与应用[J];工程质量;2016年08期
3 侯学良;李彦青;刘凯;;基于战略联盟的电力工程EPC项目信息化管理平台[J];电网与清洁能源;2016年07期
4 何柯柯;;探讨建筑工程管理信息化问题[J];中国管理信息化;2016年09期
5 刘畅;郭婧娟;;造价过程中的BIM应用障碍探究[J];工程管理学报;2016年02期
6 徐友全;孔媛媛;;BIM在国内应用和推广的影响因素分析[J];工程管理学报;2016年02期
7 刘波;刘薇;;BIM在国内建筑业领域的应用现状与障碍研究[J];建筑经济;2015年09期
8 许炳;朱海龙;;我国建筑业BIM应用现状及影响机理研究[J];建筑经济;2015年03期
9 白玫;;新一轮电力体制改革的目标、难点和路径选择[J];价格理论与实践;2014年07期
10 周建亮;吴跃星;鄢晓非;;美国BIM技术发展及其对我国建筑业转型升级的启示[J];科技进步与对策;2014年11期
相关硕士学位论文 前7条
1 熊伟;电力工程EPC总承包项目信息化管理研究[D];北京邮电大学;2014年
2 王硕;工程项目施工质量管理方法的研究与应用[D];华北电力大学;2014年
3 刘博;基于移动终端的考生身份认证软件系统的设计与实现[D];济南大学;2014年
4 杨建芳;达拉特旗输变电工程项目进度管理系统信息化研究[D];华北电力大学;2013年
5 唐辉;大型建设工程项目管理仿真平台的构建与开发[D];华北电力大学;2013年
6 张康照;基于BIM实时模型的施工进度监测系统研究[D];天津大学;2012年
7 乐勋;电力工程建设项目精细化管理研究[D];华北电力大学;2012年
,本文编号:2397261
本文链接:https://www.wllwen.com/jianzhugongchenglunwen/2397261.html