铁路集装箱捷运系统车站设计研究
[Abstract]:In the face of the increasingly vigorous development of the container market, railway container transportation is in a disadvantageous position in the competition with road and air transportation because of the difficulty of improving the timeliness of railway container transportation. Based on the domestic and foreign research results and practical experience, combined with the characteristics of China's railway container transportation and the requirements of container transport timeliness, this paper constructs the railway container rapid transit system. The transportation organization and station design under the requirement of MRT system are also studied. The main research work and innovation of this paper include the following aspects: firstly, this paper proposes to construct a new railway container rapid transit system, which adapts to the situation of our country. Its general idea includes: all railway containers are organized by container trains. The main container train in the container center station or special station to direct, shift to run, no marshalling station unmarshalling, container box ticket management. On the basis of the 2008-level site network, the function of each site is improved and perfected. This paper proposes to integrate the existing railway container transportation information system, to establish the railway container transportation information system for the internal management of the railway container transportation, to set up the electronic commerce platform for the cargo owner, to realize the box ticketing, and to make the business management electronic. The paper also puts forward that the railway container handling equipment of MRT system mainly consists of rail gantry crane and front crane. At the same time, the traction power of electric and non-power sectors is discussed, and the suitable traction organization of various container trains under different dynamic conditions is put forward. Then, the paper introduces the existing railway container transportation mode both at home and abroad. Starting from the train organization form, this paper constructs the railway container train transportation system under the concept of MRT system, that is, regular direct container train, special container train, direct container train. In order to meet the transport conditions of all container flows, the transport mode system of loading and unloading container trains along the way and the small running container trains in 5 kinds of train organization forms is analyzed, and the transport organization conditions of various container trains are also analyzed in order to meet the transport conditions of all container flows. At the same time, the influencing factors and the operating principles of main container trains are analyzed briefly under the condition of MRT system. Finally, the paper analyzes the problems existing in China's existing railway container stations, and redesigns the three-level network stations. In this paper, it is put forward that in the overall setting of container central station and special station, the corresponding station type layout form is designed according to the train that receives electric traction and trains with internal combustion or electric-internal combustion dual power traction. It also analyzes the applicable conditions; the general processing station is designed and reformed according to the layout plan of the existing freight intermediate station, and the corresponding station type layout is obtained. At the same time, the number of loading and unloading lines, the type selection of loading and unloading machinery and the layout form of loading and unloading lines, as well as the direction of container trains, are considered. The layout of the loading and unloading lines, the layout of the box area when the vertical arrangement is arranged, the layout of the box area when the loading and unloading line is arranged in the front crane operation and the layout of the general handling station box area are designed. The innovation of this paper lies in the construction of a new railway container rapid transit system based on the idea of passenger transport, and puts forward a new train organization form corresponding to it. At the same time, a series of station design schemes to meet the railway container train organization are put forward from the station design, which provides a new reference for the study of railway container transportation.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U291.5
【参考文献】
相关期刊论文 前10条
1 魏玉光;苏寅;张超;杨浩;张琦;;我国铁路集装箱旅客化快捷运输系统创新[J];中国铁路;2016年04期
2 张磊;;我国铁路集装箱运输发展SWOT分析[J];集装箱化;2015年12期
3 Romann Porta;Bernhard Kund;韩才元;;用于北美的ALP-45DP型双动力源机车[J];国外铁道机车与动车;2013年05期
4 李金龙;张红亮;;我国铁路集装箱运输发展对策的思考[J];铁道货运;2013年01期
5 唐述春;杨浩;石雨;;铁路集装箱中心站管理信息系统研究[J];物流技术;2012年11期
6 杨芳;;铁路集装箱中心站站场配置的探讨[J];铁道货运;2011年10期
7 武兵;高岩梅;;新形势下优化铁路集装箱运输组织方式的思考[J];上海铁道科技;2011年01期
8 刘广峰;;成都铁路集装箱中心站选址及站型方案探讨[J];四川建材;2010年04期
9 廖树梁;;基于一体化组织的铁路集装箱作业流程的优化[J];上海铁道科技;2010年02期
10 汪涛;朱晓宁;马金元;乔瑞军;钱继锋;;三级网络结构的铁路集装箱一体化服务体系设计[J];物流技术;2009年10期
相关博士学位论文 前1条
1 洪雁;铁路集装箱运输系统规划若干问题研究[D];北京交通大学;2008年
相关硕士学位论文 前10条
1 郭洪文;铁路集装箱旅客化运输组织模式及开行方案研究[D];北京交通大学;2016年
2 张军锋;昆明铁路局装卸机械优化配置研究[D];西南交通大学;2014年
3 文全林;铁路集装箱运输组织相关问题研究[D];西南交通大学;2013年
4 刘东啸;RFID技术在铁路集装箱中心站的应用研究[D];北京交通大学;2011年
5 张晓洁;铁路集装箱运输产品优化配置研究[D];北京交通大学;2011年
6 戴宁;铁路集装箱中心站货场布局方法的研究[D];西南交通大学;2011年
7 古前娟;集装箱中心站开行集装箱班列的研究[D];西南交通大学;2011年
8 赵红霞;现代物流条件下铁路集装箱中心站设施布局优化[D];西南交通大学;2010年
9 柴甜甜;基于三级站点的集装箱列车开行方案研究[D];西南交通大学;2010年
10 付强;铁路快捷货物运输系统分析及其列车开行方案研究[D];西南交通大学;2010年
,本文编号:2282637
本文链接:https://www.wllwen.com/jingjilunwen/dianzishangwulunwen/2282637.html