佛山西站枢纽新城配电网规划研究
[Abstract]:As the most developed area in the west coast of Pearl River Estuary and Guangdong Province, the demand for electricity load in Nanhai District of Foshan City is increasing rapidly. In recent years, the scale of grid investment has lagged behind the economic development, resulting in the bottleneck of economic growth in the South China Sea. As a terminal connected with users, 10kV distribution network is the most important part of the whole grid. Therefore, through the structure of the distribution network, the distribution points are continuously optimized to meet the needs of the new load to the greatest extent, which has become a key issue in the research of power technology in recent years. Based on the analysis of the existing substation and power grid in Foshan West Railway Station, combined with the report and installation of all the large users, the government carried out the load forecasting for the detailed planning of the area. In order to determine the planning and design plan of the medium and low voltage distribution network of Foshan West Railway Station hub, form the comprehensive project database of the new construction and transformation project, and on the basis of this, the investment estimation and economic comparison are carried out, and the final scheme is determined according to this. In order to solve the problems existing in the distribution network operation of Foshan West Railway Station, and meet the load demand of the new users. The contents of this plan include: analyzing the operation status of 10kV distribution network in Foshan West Railway Station, forecasting the power network load before 2020, determining the technical guidelines of planning and design basis, completing the new construction and rebuilding scheme, and so on. First of all, the operation status of 10kV distribution network in Foshan West Railway Station is analyzed, including the operation and maintenance of 10kV distribution network and key equipment indicators, the statistics of service time of various equipment, the load rate of higher power supply. Superior power supply 10kV cabinets use analysis and other content. Through the statistical analysis of the above indexes, it can be concluded that the grid structure is reasonable, the operation condition of various equipments is good, whether the distribution of power points and the power supply radius meet the requirements, whether the load borne by higher substations is reasonable or not, and so on. In order to determine the direction and thinking of the distribution network planning plan of Foshan West Railway Station. Secondly, according to the loading situation of all the large users such as Foshan West Railway Station, the government forecasts the detailed planning of the area, including the maximum load demand of the 10kV distribution network and its superior power supply, and the forecast of the actual load utilization rate and so on. The total power supply, the position of the power point and the topology of the power supply are determined by the prediction results. Finally, determine the detailed new, reconstruction program. The specific contents include power supply capacity, position and construction time, line direction of 10kV line and transformer capacity, distribution room, switch room and other equipment distribution points, and finally form a complete new construction, transformation scheme, etc. And complete the corresponding project library.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TM715
【参考文献】
相关期刊论文 前10条
1 巴宝华;魏玉仁;;浅谈10kV配电网规划设计方法[J];科技创新与应用;2014年33期
2 严诚;;浅谈配电网规划存在的问题及措施[J];企业技术开发;2014年33期
3 黄嘉健;郑文杰;;基于元件失效模型的配电网改造方法研究[J];广东电力;2014年11期
4 苟育洲;路昕;;110kV及以下配电网建设规划设计要素分析[J];科技与企业;2014年22期
5 赵江伟;;基于最大供电能力的智能配电网规划与运行新思路[J];价值工程;2014年31期
6 钟俊辉;;关于城市配电网规划的问题及对策初探[J];科技与创新;2014年19期
7 高涵冰;刘丽君;;有关配电网规划建设要点探析[J];科技风;2014年17期
8 王乐;赵海平;;对10kv配电网供电可靠性的研究[J];科学中国人;2014年14期
9 肖裕富;;配电网规划中电力负荷预测中的关键问题分析[J];科技经济市场;2014年06期
10 刘胜利;陈建华;曹阳;陈刚国;;基于N-1和负荷特性的配电网最大接入容量研究[J];电力系统保护与控制;2014年12期
相关博士学位论文 前5条
1 唐慧;区域电网智能化发展水平综合评价研究[D];华北电力大学(北京);2011年
2 杨卫红;城市电网规划风险评价模型及风险规避方法研究[D];华北电力大学(北京);2010年
3 唐跃中;数字化电网若干关键技术研究[D];浙江大学;2010年
4 罗凤章;现代配电系统评价理论及其综合应用[D];天津大学;2010年
5 王迎秋;城市电网规划项目关键问题研究[D];天津大学;2007年
相关硕士学位论文 前10条
1 王亚男;配电网运行水平和供电能力评估综合管理系统研究与开发[D];湖南大学;2013年
2 范文明;地级电力市场中智能电网发展研究[D];华北电力大学;2013年
3 马立芝;10KV及以下配电网线损管理系统改进研究[D];华北电力大学;2013年
4 陈志勇;配电网电压层级优化研究[D];广东工业大学;2012年
5 包依平;电网运行方式评估及系统开发[D];湖南大学;2012年
6 黄勇建;城市配电网规划及其技术评估方法研究[D];南昌大学;2010年
7 金世鑫;配电网接线模式识别的优化与提速[D];天津大学;2010年
8 程璐;基于配电网改造的智能电网投融资模式研究[D];北京交通大学;2010年
9 陶卫君;城市电网规划风险评价与规避研究[D];华北电力大学(北京);2010年
10 姚丽;中压配电网络自动规划的研究[D];天津大学;2009年
,本文编号:2388335