吕临能化千万吨矿井通风保障技术研究
本文选题:矿井通风 切入点:资源整合 出处:《辽宁工程技术大学》2017年硕士论文 论文类型:学位论文
【摘要】:随着国家经济的快速发展,全国煤炭产量也达到了历史的最高点,各大矿局通过资源整合不断扩大矿井产量,吕临能化千万吨矿井的建设就是其中典型的例子。吕临能化千万吨矿井的建设主要是把庞庞塔矿与千万吨项目部整合为一个整体,通过扩大现有产量形成千万吨生产规模的现代化大型矿井。为了实现整合后的千万吨矿井能够有一个可靠、稳定的通风系统去保障安全生产,本论文针对庞庞塔矿与千万吨项目部现阶段的矿井通风系统运行情况进行分析研究。首先对庞庞塔矿与千万吨项目部通过750大巷连通为一个整体进行模拟分析与方案制定,找出各个方案的优缺点,然后通过对各个贯通方案进行全面比较和综合分析得出一个最佳的贯通方案。在750大巷以最佳方案贯通后,对庞庞塔矿与千万吨项目部的通风系统进行全面分析,验证贯通后千万吨矿井与750巷道风流的稳定性,找出通风系统中的不足,尤其是阻力过大区域和风量利用情况,提出合理的解决措施。在前两步的基础上,为提高整合后的千万吨矿井抗灾变能力,对庞庞塔矿与项目部采区独立通风、风机停转、全矿井的反风等进行仿真模拟分析。通过模拟的方法提前预测风机停转、反风后矿井通风系统的变化,从而制定应对井下火灾等突发情况的应急预案。通过对以上三个主要部分的分析研究,要使庞庞塔矿与千万吨项目部顺利贯通后的千万吨大型现代化矿井有一个稳定可靠的通风系统,为千万吨矿井以后的安全生产打下坚实的基础。
[Abstract]:With the rapid development of the national economy, the national coal production has also reached the highest point in history. The construction of the 10 million ton mine in Lv Lineng is a typical example. The construction of the 10 million ton mine in Lu Lineng is mainly to integrate the Pompangta mine with the 10 million ton project department as a whole. A modern large-scale mine with a production scale of 10 million tons by expanding its existing output. In order to achieve the integration of the 10 million ton mine, there can be a reliable and stable ventilation system to ensure the safety of production. This paper analyzes and studies the operation of ventilation system in Pompangta Mine and 10 million ton Project Department at the present stage. First of all, it simulates, analyzes and formulates the scheme of Pompangta Mine and 10 million ton Project Department through the connection of 750 roadways as a whole. Find out the merits and demerits of each scheme, and then through the comprehensive comparison and comprehensive analysis of each through scheme, we can get the best through plan. After the 750 alleys pass through with the best plan, The ventilation system of Pompangta mine and ten million ton project department is comprehensively analyzed to verify the stability of the ventilation flow in the ten million ton mine and 750 roadway after the completion, and to find out the shortcomings of the ventilation system, especially in the area of excessive resistance and the utilization of air volume. On the basis of the first two steps, in order to improve the disaster resistance ability of the integrated ten million ton mine, the ventilation of Pompangta mine and the mining area of the project department are independently ventilated and the fan stops running. Through the method of simulation, the change of mine ventilation system is predicted in advance after the fan is stopped and the ventilation system is changed after the reverse air. In order to formulate emergency plans to deal with underground fire and other emergencies. Through the analysis and study of the above three main parts, A stable and reliable ventilation system will be established between Pompangta Mine and the ten million ton project department, which will lay a solid foundation for the safety production of the ten million ton mine.
【学位授予单位】:辽宁工程技术大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD72
【参考文献】
相关期刊论文 前10条
1 马恒;倪景峰;刘剑;;矿井通风管理信息系统开发及其应用[J];华北科技学院学报;2014年08期
2 王海宁;彭斌;彭家兰;刘成敏;汪光鑫;;大型复杂矿井通风系统的共性问题分析与优化实践[J];安全与环境学报;2014年03期
3 赵文利;;矿井通风的安全管理探析[J];煤炭技术;2013年05期
4 李春生;;衰老矿井通风系统稳定经济运行的对策与措施[J];煤炭科学技术;2012年09期
5 谢和平;王金华;申宝宏;刘见中;姜鹏飞;周宏伟;刘虹;吴刚;;煤炭开采新理念——科学开采与科学产能[J];煤炭学报;2012年07期
6 王海宁;刘菊红;;金属矿山热源散热影响因子及通风降温技术研究[J];矿业研究与开发;2012年02期
7 薛毅;;关于中国古代煤炭历史研究的几个基本问题[J];中国矿业大学学报(社会科学版);2012年01期
8 马恒;尹彬;刘剑;;矿井风流温度预测分析研究[J];中国安全科学学报;2010年11期
9 程磊;党海波;吴磊;;矿井通风网络分析方法研究现状与发展趋势[J];煤;2010年08期
10 朱华新;魏连江;张飞;李纪洲;苏松;;矿井通风可视化仿真系统的改进研究[J];采矿与安全工程学报;2009年03期
相关硕士学位论文 前7条
1 彭斌;大型复杂矿井通风系统优化研究[D];江西理工大学;2014年
2 张也弛;中国煤矿企业安全生产的政府监管研究[D];吉林财经大学;2014年
3 黄紫彬;扩能矿井的通风系统改造研究[D];江西理工大学;2011年
4 屈世甲;矿井通风基础数据获取及网络图优化方法的研究[D];西安科技大学;2010年
5 史东涛;基于灵敏度的风量异常与风量调节的分析研究[D];西安科技大学;2008年
6 贾廷贵;五龙矿通风系统优化改造研究[D];辽宁工程技术大学;2005年
7 邱进伟;矿井通风系统分析与优化研究[D];安徽理工大学;2005年
,本文编号:1652575