基于缩小煤柱开采实验的断层带稳定性分析
[Abstract]:A similar material model was established on the basis of F _ tensional fault in Longdong Coal Mine to monitor the variation of rock mass displacement in both sides of the fault zone during the process of reducing coal pillar. The experimental results show that the vertical displacement of the top and bottom of the goaf increases gradually with the decreasing of the width of the pillar of the fault, the closer the displacement is to the coal seam, the smaller the change of the downboard displacement is. When the width of coal pillar is reduced to 30 m, the roof displacement changes, and the vertical displacement of the bottom rock is obviously different near the two sides of the fault zone, the displacement difference is up to 0.14 m. The obvious dislocation of the upper wall rock along the fault zone leads to the instability of the fault zone. The experimental results can provide a reference for the reasonable setting of the width of the coal pillar of the fault.
【作者单位】: 安徽理工大学地球与环境学院;安徽理工大学土木建筑学院;
【基金】:国家自然科学基金(41272278) 安徽省高校自然科学基金(KJ2016SD19)
【分类号】:TD745.2;TD822.3
【相似文献】
相关期刊论文 前10条
1 王汉龙;;煤田断层带水和瓦斯的突出机理及其赋存特点分析[J];中州煤炭;2010年06期
2 于锁恩;周同学;孙达;;断层带内安全生产技术的实践[J];科技信息;2011年07期
3 赵毅鑫;姜耀东;孟磊;王涛;刘华博;;超前管棚注浆支护技术在极复杂断层带中的应用[J];采矿与安全工程学报;2013年02期
4 吴基文;姜振泉;童宏树;唐东旗;;任楼煤矿F_3断层带导、含水性评价[J];煤炭工程;2006年01期
5 崔洪庆;姚念岗;;断层带煤岩应力分布特征数值模拟研究[J];河南理工大学学报(自然科学版);2011年05期
6 张建伟;孙长斌;;断层带预支护与注浆修复的使用[J];能源与节能;2013年11期
7 姜玉松;断层带高压注浆工艺与技术[J];金属矿山;2001年12期
8 刘玉鼎;孙圣明;;固邦特加固技术在断层带停采撤面前的应用[J];煤矿现代化;2010年04期
9 李凤梅,芦付松,张乾,赵建军,刘思远;岩巷过断层带超前支护技术实践[J];煤矿现代化;2004年05期
10 刘东;商力;;挪威掘进法的几种主要支护方式[J];世界采矿快报;1993年12期
相关会议论文 前2条
1 胡殿奎;葛中华;;平煤集团七矿煤层底板和断层带水压裂试验及抗水压性研究[A];岩石力学理论与工程实践[C];1997年
2 李志红;何勇;;复杂断层带石门穿煤层施工技术[A];瓦斯地质理论与实践——中国煤炭学会瓦斯地质专业委员会第五次全国瓦斯地质学术研讨会论文集[C];2005年
相关重要报纸文章 前1条
1 袁金牛 杨小琴;坪湖煤矿巧战巨型断层带[N];中国矿业报;2012年
相关硕士学位论文 前1条
1 张欢;断层带巷道支护技术研究及应用[D];安徽理工大学;2015年
,本文编号:2305458
本文链接:https://www.wllwen.com/kejilunwen/anquangongcheng/2305458.html