核电厂消防稳压系统部分问题探讨
发布时间:2018-02-26 22:39
本文关键词: 核电 消防稳压罐 必要性 调节水量 抗震 出处:《给水排水》2017年S2期 论文类型:期刊论文
【摘要】:介绍了核电厂关于稳压罐给水时间规定的源头,并对相关计算做了复现,同时探讨了核电厂稳压罐设置与GB50974-2014的一致性,地震后稳压系统丧失的影响等问题。通过分析认为在核电厂设置非抗震的消防稳压罐具有一定的合理性,对稳压罐的容积设计也给出了建议。
[Abstract]:This paper introduces the source of the water supply time of the steady pressure tank in the nuclear power plant, and reappears the relevant calculation. At the same time, the consistency between the setting of the steady pressure tank and the GB50974-2014 in the nuclear power plant is discussed. Based on the analysis of the influence of the loss of stabilizing system after earthquake, it is considered that it is reasonable to set up non-seismic fire stabilizer tank in nuclear power plant, and some suggestions are also given for the volumetric design of stabilizing pressure tank.
【作者单位】: 深圳中广核工程设计有限公司;
【分类号】:TM623.8
,
本文编号:1539977
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/1539977.html