临沂市配电网建设规划及其管理体系研究

发布时间:2018-04-01 21:22

  本文选题:配电网 切入点:建设规划 出处:《华北电力大学(北京)》2017年硕士论文


【摘要】:配电网建设规划是配电网全生命周期管理中的重要一环,其目的是构建规划期末理想的网架结构,满足电网运行容量充裕、安全可靠、方式灵活、经济高效等要求。“十三五”期间,国家进一步加大配电网投资强度,倡导精准投资理念,对电网建设规划工作提出了更高标准的要求。为破解制约当前电网发展建设的难题,保障坚强智能电网的有效落成,迫切需要电网企业理顺配电网建设规划管理流程,切实提高建设规划管理水平。目前,临沂公司配电网规划工作已形成了基本的思路和方法,配电网规划管理体系也初具雏形。然而,由于诸多原因导致的配电网规划经验不足、管理流程不顺畅、对规划工作重视不足等一系列问题,使得配电网建设规划工作仍然无法摆脱规划管理欠科学,规划成果执行力度不够等规划“软弱无力”的状态。本文总结了当前国内外在配电网建设规划方面的理论研究成果,对比国内外配网规划在工作目标、规划年限、工作流程和组织机构方面的异同,详细阐述了国内开展配网规划工作的内容、方法和管理体系,提出了基于矩阵式组织结构的全过程规划管理理念。以临沂市配电网规划工作为研究对象,首先分析了现状配电网建设的不足和面临的发展瓶颈,针对当前电网发展建设多元化目标的要求,从系统的角度展开研究,确定规划方案。在此基础上,重新梳理了临沂市配网规划管理体系,针对管理流程不顺畅,执行效果不佳的问题,提出了成立规划项目工作组,采用规划全过程管理的解决措施。该理论应用于临沂市“十三五”配电网规划,取得了较好的效果。本文研究对国内外同类型区域配网建设规划同样有一定参考价值。
[Abstract]:Distribution network construction planning is an important part in the whole life cycle management of distribution network. Its purpose is to construct the ideal network structure at the end of the planning period, which can meet the needs of sufficient capacity, safety and reliability, and flexible mode of distribution network. Economic efficiency and other requirements. During the 13th Five-Year Plan period, the state further increased the investment intensity of distribution networks, advocated the concept of precision investment, and put forward higher standards for the planning of power grid construction. In order to solve the difficult problems restricting the development and construction of the current power grid, To ensure the effective completion of a strong smart grid, it is urgent for power grid enterprises to straighten out the distribution network construction planning management process and improve the construction planning and management level. At present, Linyi Company's distribution network planning work has formed the basic ideas and methods. However, due to many reasons, the distribution network planning experience is not enough, the management process is not smooth, and the planning work is not paid enough attention to. The distribution network construction and planning work is still unable to get rid of the "weak" state of planning, such as unscientific planning management and insufficient execution of planning results. This paper summarizes the current theoretical research results of distribution network construction planning both at home and abroad. Comparing the similarities and differences of distribution network planning at home and abroad in work objectives, planning years, workflow and organization, the contents, methods and management system of developing distribution network planning in China are described in detail. This paper puts forward the concept of whole process planning and management based on matrix organization structure. Taking Linyi distribution network planning as the research object, this paper first analyzes the deficiency of the current distribution network construction and the bottleneck of the development. In view of the requirement of the pluralistic goal of power grid development and construction, this paper studies from the system point of view and determines the planning scheme. On this basis, the planning and management system of Linyi distribution network is reorganized, and the management process is not smooth. In order to solve the problem of poor implementation effect, a planning project working group was set up and the solution of the whole planning process management was adopted. The theory was applied to the distribution network planning of Linyi City during the 13th Five-Year Plan. The research in this paper has some reference value for the same type of regional distribution network construction planning at home and abroad.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM715

【参考文献】

相关期刊论文 前10条

1 宋峰;姜代鹏;张明耀;廉伟;徐桢;;基于马尔可夫链修正的电力电量灰色预测研究[J];山东电力技术;2016年03期

2 刘国平;王聪;赵杰;耿亮;李梁;;基于服务城市行政区域拓展的高效配电网规划管理体系研究[J];河北电力技术;2016年01期

3 汪nr;刘晓明;赵龙;;基于资产全寿命周期管理的输电网规划方案优化[J];山东电力技术;2015年03期

4 赵振宇;吕乾雷;游维扬;;基于信息交互分析的建设工程变更预测[J];土木工程学报;2011年01期

5 赵振宇;吕乾雷;;项目进度控制的双边缓冲区方法研究[J];工程管理学报;2010年05期

6 孙新颖;;WBS在项目管理中的应用研究[J];中小企业管理与科技(上旬刊);2008年10期

7 张倩;陈维荣;;电力系统优化算法综述[J];科协论坛(下半月);2008年03期

8 赵振宇;罗欣;;项目管理中的跨部门合作[J];中国电力教育;2007年S4期

9 颜伟;王丽娜;;基于改进免疫遗传算法的配电网网架规划[J];重庆大学学报(自然科学版);2007年01期

10 杨文宇,刘健,余健明,燕飞;基于竞争算法的配电网络优化规划方法[J];西安理工大学学报;2005年02期

相关硕士学位论文 前5条

1 姜在兴;怀柔区配电网工程建设规划与管理研究[D];华北电力大学;2012年

2 蒋鹏;电网规划方案技术经济评价方法研究[D];上海交通大学;2010年

3 徐国智;基于GIS的配电网辅助决策系统在电力规划中的应用研究[D];华南理工大学;2010年

4 董韬;电网规划项目综合评价研究[D];华北电力大学(河北);2008年

5 胥晓晖;基于GIS的电网规划管理系统研究[D];山东大学;2005年



本文编号:1697358

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/1697358.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户42f2e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com