【摘要】:高压配电网是连接输电网和中压配电网的重要环节,其规划方案的合理与否将直接影响电网系统整体的安全性、可靠性、电能质量以及电网的经济效益和社会效益。因此,深入研究高压配电网规划方案评价方法,实现最优决策,将使配电系统具有更高的供电可靠性、更高的电网资产利用率、更优质的电能质量。高压配电网建设项目具有资金密集,实施周期长,不确定因素多等特点。科学、合理的规划方案能有效节约投资,提高系统供电安全性和可靠性。电网规划方案评价主要是通过综合权衡现已形成备选规划方案技术、经济、效能、社会等方面的指标,决策出最优的规划方案。在对配电网规划方案的评价决策过程中不仅要考虑经济性和可靠性问题,也要考虑风险性问题和电网设备的利用效率。本文在研究配电网安全效能成本管理理念的基础上,考虑配电网负荷呈现明显的时序特性,将负荷时序特性计入运行成本的计算过程中,同时考虑停电频率、停电量、用户类型对停电成本的影响,建立计及多影响因素的配电网全寿命周期成本模型。该模型在综合考虑配电网规划方案初始投资、运行维护、故障报废各阶段的成本总和的同时,将多种影响因素计入规划方案的运行成本和故障成本中。在深入研究规划方案全寿命周期成本的同时,兼顾规划方案的风险和效能。规划方案的风险系数从配电网规划方案的结构、技术、经济和环境四方面进行评估获得。配电网规划方案的效能系数则通过规划方案电压合格率指标评估获得。最后在计及多影响因素的配电网全寿命周期成本模型的基础上,将风险与效能评估结果计入目标函数,建立配电网规划方案的风险效能成本(REC)评价模型。实际案例分析表明本文提出的计及全寿命周期风险效能成本的配电网规划评价模型使风险、效能和周期成本统筹处理,科学合理,可操作性强,提高了电网规划评价工作的客观性和科学性。
[Abstract]:High voltage distribution network is an important link to connect transmission network and medium voltage distribution network. Whether its planning scheme is reasonable or not will directly affect the overall security, reliability, power quality, economic and social benefits of the network.Therefore, studying the evaluation method of HV distribution network planning scheme and realizing the optimal decision will make the distribution system have higher reliability of power supply, higher utilization ratio of power network assets and higher quality of power quality.High-voltage distribution network construction project has the characteristics of capital-intensive, long implementation period and many uncertain factors.Scientific and reasonable planning scheme can effectively save investment and improve the security and reliability of power supply system.The evaluation of power network planning scheme is mainly to make the optimal planning scheme by synthetically weighing the technical, economic, efficiency and social indicators of the alternative planning scheme.In the process of evaluation and decision of distribution network planning scheme, not only economic and reliability issues should be considered, but also risk and utilization efficiency of power network equipment should be considered.On the basis of studying the concept of security efficiency cost management of distribution network, this paper considers the obvious time series characteristic of distribution network load, and takes the time sequence characteristic of load into account in the calculation process of operation cost, at the same time considering the frequency and quantity of power outage.The effect of user type on power outage cost is discussed. The life cycle cost model of distribution network considering multiple factors is established.In this model, the total cost of initial investment, operation and maintenance of distribution network planning scheme, and the total cost of each stage of failure are considered, and many factors are taken into account in the operation cost and fault cost of the planning scheme.At the same time, the risk and efficiency of the planning scheme are also taken into account while the whole life cycle cost of the planning scheme is studied in depth.The risk coefficient of the planning scheme is obtained from the structural, technical, economic and environmental aspects of the distribution network planning scheme.The efficiency coefficient of the distribution network planning scheme is obtained by evaluating the voltage pass rate of the planning scheme.Finally, on the basis of the life-cycle cost model of distribution network considering multiple factors, the risk and effectiveness evaluation results are taken into account in the objective function, and the risk effectiveness cost evaluation model of distribution network planning scheme is established.The analysis of practical cases shows that the evaluation model of distribution network planning, which takes into account the cost of life cycle risk effectiveness, makes the risk, efficiency and cycle cost to be handled as a whole, which is scientific, reasonable and feasible.It improves the objectivity and scientific nature of power grid planning evaluation.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM715

【参考文献】

相关期刊论文 前10条

1 王玉磊;应黎明;陶海洋;杨磊;;基于效能-成本的智能变电站二次设备运维策略优化[J];电力自动化设备;2016年06期

2 郑旭;丁坚勇;尚超;雷庆生;王小鑫;;计及多影响因素的电网停电损失估算方法[J];武汉大学学报(工学版);2016年01期

3 林海雪;;电能质量指标的完善化及其展望[J];中国电机工程学报;2014年29期

4 赵万里;王智冬;刘连光;刘自发;;基于灰色关联分析的输电网规划方案模糊综合评价[J];电测与仪表;2014年06期

5 羌丁建;寿挺;朱铁铭;黄民翔;钟宇峰;范华;;高压配电网规划评价指标体系与综合评价模型[J];电力系统保护与控制;2013年21期

6 王深哲;高山;李海峰;罗建裕;;含高渗透率间歇性电源的电网规划方案优选方法[J];电网技术;2013年08期

7 宋春丽;刘涤尘;吴军;董飞飞;赵一婕;潘旭东;王浩磊;;基于差异化全寿命周期成本的电网规划经济性评估方法[J];电网技术;2013年07期

8 李倩玉;焦石;;全寿命周期成本在配电网规划中的应用[J];电工电气;2013年02期

9 杨海涛;吴国e,

本文编号:1709403


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/1709403.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e0a70***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com