石灰石-石膏湿法单塔双循环脱硫技术在中山火电厂的应用
发布时间:2018-08-02 16:37
【摘要】:中山火力发电有限公司2×300MW机组锅炉燃煤含硫量1.5%,原烟气中SO2含量为3800 mg/Nm3,为了满足净烟气50mg/Nm3的排放要求,本工程采用石灰石-石膏湿法单塔双循环脱硫工艺,FGD装置脱硫效率可以做到98.3%。
[Abstract]:The coal combustion sulfur content of 2 脳 300MW unit boiler of Zhongshan Thermal Power Co., Ltd. Is 1.5 and the SO2 content in the original flue gas is 3800 mg / Nm3. In order to meet the requirement of net flue gas 50mg/Nm3 emission, In this project, the desulphurization efficiency of FGD unit with limestone and gypsum wet single tower and double cycle desulfurization process can be 98.3%.
【作者单位】: 南京龙源环保有限公司;
【分类号】:X773
本文编号:2160036
[Abstract]:The coal combustion sulfur content of 2 脳 300MW unit boiler of Zhongshan Thermal Power Co., Ltd. Is 1.5 and the SO2 content in the original flue gas is 3800 mg / Nm3. In order to meet the requirement of net flue gas 50mg/Nm3 emission, In this project, the desulphurization efficiency of FGD unit with limestone and gypsum wet single tower and double cycle desulfurization process can be 98.3%.
【作者单位】: 南京龙源环保有限公司;
【分类号】:X773
【相似文献】
相关期刊论文 前10条
1 胡纪;;又一套含硫污水单塔汽提装置投入正常生产[J];炼油化工环境保护;1984年01期
2 辛俊杰;对开好单塔污水汽提粗氨精制系统的论述[J];石油化工环境保护;2003年01期
3 夏取胜;;含硫污水单塔汽提装置停开工污染的防治[J];石油化工安全环保技术;2007年01期
4 刘占松;炼油厂工业污水中氨的回收与处理工艺[J];石油化工环境保护;2004年04期
5 刘宏;单塔加压汽提装置实施清洁生产效益分析[J];辽宁城乡环境科技;2000年04期
6 熊献金;单塔加压侧线抽出污水汽提工艺流程模拟程序包的建立及其应用[J];炼油技术与工程;2004年12期
7 冯大春;;带侧线单塔加压汽提同时脱酸脱氨工艺应用现状[J];广州化工;2010年12期
8 王小会;;单塔加压汽提装置在鲁奇炉污水处理中的应用分析[J];化工管理;2013年02期
9 张海英;综合治理腈纶污水COD的含量[J];油气田地面工程;2004年05期
10 ;[J];;年期
,本文编号:2160036
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2160036.html