唐山地区配电网规划方案研究
[Abstract]:Distribution network is the middle part of the connection between users and main network. With the development of economy, the power supply capacity of distribution network is becoming more and more high, and the construction of distribution network cannot be done once and for all. It is necessary to plan and adjust the structure of the distribution network and the power supply regulation equipment for a period of time. Whether the distribution network is reliable or not will directly affect the user's experience of using electricity. Therefore, it is of great significance to plan the distribution network reasonably and improve the reliability and economy of the distribution network. On the basis of analyzing the background and significance of distribution network planning, the structure of high voltage, medium voltage and low voltage distribution network in Tangshan area is analyzed firstly, and the high, medium and low distribution network equipments such as line are analyzed in detail. This paper analyzes the operation and load of substation equipment, and finds out the main problems existing in the distribution network of high voltage and medium voltage in Tangshan area at present, based on the analysis of historical electricity consumption in Tangshan area, This paper analyzes the situation of electric power demand in Wutang Mountain area in the future, and forecasts the electricity quantity of Tangshan Central District, Kaiping District, Ancient smelter area and Harbour Development Zone, and carries out the forecast of prospect and close-range load respectively. For Tangshan area distribution network planning laid the foundation. The goal and technical principle of distribution network planning are studied. According to the present situation of distribution network in Tangshan area, the technical principles suitable for distribution network of 110 kV / 10 kV / 380V distribution network in Tangshan area are given, and the 110kV distribution network of 220kV distribution network and four districts (center area, Kaiping area) of 220kV distribution network are determined. The number and location of substation in distribution network of Tangshan area are determined. Finally, the investment estimation of distribution network planning in Tangshan area is given.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM715
【参考文献】
相关期刊论文 前10条
1 姚建国;严胜;杨胜春;杨志宏;高宗和;;中国特色智能调度的实践与展望[J];电力系统自动化;2009年17期
2 李惠玲;盛万兴;孟晓丽;;基于改进小生境遗传算法的配电网全网无功优化[J];电网技术;2009年04期
3 梁俊晖;廖志伟;黄志元;文福拴;郭文鑫;何祥针;彭飘;;广东电网事故处理智能辅助决策专家系统开发[J];南方电网技术;2008年06期
4 艾琳;华栋;;电力系统智能型调度[J];电力自动化设备;2008年10期
5 刘传铨;张焰;;计及分布式电源的配电网供电可靠性[J];电力系统自动化;2007年22期
6 张铁峰;王江涛;苑津莎;;智能配电网研究[J];电力系统通信;2007年11期
7 孙宏斌;谢开;蒋维勇;王皓;张伯明;罗建裕;;智能机器调度员的原理和原型系统[J];电力系统自动化;2007年16期
8 姚建国;杨胜春;高宗和;杨志宏;;电网调度自动化系统发展趋势展望[J];电力系统自动化;2007年13期
9 杜至刚;牛林;赵建国;;发展特高压交流输电,建设坚强的国家电网[J];电力自动化设备;2007年05期
10 赵兴勇;张秀彬;;特高压输电技术在我国的实施及展望[J];能源技术;2007年01期
相关硕士学位论文 前3条
1 石磊;基于可靠性的中低压配电网规划研究[D];华北电力大学;2014年
2 吴强;苏州示范区配电网规划研究[D];华北电力大学;2013年
3 武钰;海口地区配电网发展规划研究[D];华北电力大学(北京);2011年