220kV变电站项目选址综合评价研究
[Abstract]:In recent years, with the continuous development of social economy, the demand for power energy is increasing. In order to ensure the residents, enterprise production, life needs, the planning and construction of power grid is increasing, and the research on power network planning is becoming more and more perfect. In each stage of power grid construction, there are research results in each part. Substation is one of the important parts of power network system. The reasonable and scientific construction of substation will play an important role in the long-term planning of the whole power network, investment income and the guarantee of power supply quality. The purpose of substation site selection research is to comprehensively and scientifically analyze and evaluate each alternative site in order to realize the optimization of the scheme location by combining with many influencing factors of site selection. Firstly, the purpose and importance of substation location are summarized and analyzed to determine its important position in the whole power system. Then it analyzes the characteristics of many influencing factors and the principle of location selection in substation site selection, and explains the necessity of substation construction combined with the actual situation of Changxing Island and 90% heavy industry power load in Dalian. This paper mainly from the grid construction, economic benefits, environmental factors, social impact, construction facilities as five layers, including line corridors, load center distance, total investment in construction, hydrometeorology, engineering geology, government, Based on the analysis of 17 specific influencing factors, such as the attitude of the residents and the quantity of earthwork and rock works, to judge the influence on the target layer, to establish an evaluation index system for the problem of the location of the substation site, and to consider the influencing factors comprehensively and comprehensively. Based on Analytic hierarchy process (AHP), the problem of substation location selection is transformed from multi-objective decision making problem with many factors to a hierarchical analytic hierarchy process (AHP) optimization problem. At the same time, combined with the grey relational analysis method, the weight of the index is modified by the method of combination weight, which makes the weight better to express the importance and influence degree of the index, so it is more persuasive to determine the station address. It is verified in the actual project.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM63
【参考文献】
相关期刊论文 前10条
1 吕朋蓬;赵晋泉;李端超;朱泽锋;;电网运行状态评价指标体系与综合评价方法[J];电网技术;2015年08期
2 王敬敏;郭小帆;安东;;低碳背景下变电站选址评价体系构建研究[J];陕西电力;2015年01期
3 凌盛;刘儒;;35kV雅瑶变电站项目可行性评价研究[J];电气开关;2013年04期
4 赵吴鹏;;电网项目前评价与后评价的管理分析[J];科技和产业;2013年01期
5 罗毅;李昱龙;;基于熵权法和灰色关联分析法的输电网规划方案综合决策[J];电网技术;2013年01期
6 王李惠;孙轶群;江修波;;计及地理因素基于遗传算法的变电站选址模型研究[J];供用电;2012年05期
7 黄少先;徐松林;;基于GIS与灰色聚类评估模型的变电站选址[J];电力系统保护与控制;2011年24期
8 夏萍;汪凯;李宁秀;吴大嵘;;层次分析法中求权重的一种改进[J];中国卫生统计;2011年02期
9 王艳菊;王珏;吴泽宁;胡彩虹;;基于灰色关联分析的支持向量机需水预测研究[J];节水灌溉;2010年10期
10 董永峰;杨彦卿;宋洁;顾军华;颜威利;;基于改进粒子群算法的变电站选址规划[J];继电器;2008年05期
相关硕士学位论文 前10条
1 张鑫;配电网负荷预测及其规划优化方法的研究与实践应用[D];山东大学;2016年
2 张学强;基于物元可拓模型的变电站选址综合评价研究[D];华北电力大学;2016年
3 路佳;鄂尔多斯达拉特西220kV变电站站址选择研究[D];华北电力大学;2015年
4 徐秋卉;基于灰色关联和组合赋权的智能输配电网综合评价研究[D];华北电力大学;2015年
5 曹兴杰;变电站选址组合模型与应用研究[D];华北电力大学;2015年
6 巩持恒;基于灰色理论的变电站选址研究[D];郑州大学;2014年
7 刘盛;基于模糊灰色关联投影法的变电站选址方法及应用[D];华北电力大学;2014年
8 王雪萍;夏邑北镇变电站备选站址评价研究[D];华北电力大学;2014年
9 李涛;基于模糊层次分析法和灰色关联分析方法的变电站选址研究[D];郑州大学;2014年
10 董奇;低碳背景下变电站选址模型与实证研究[D];华北电力大学;2014年
,本文编号:2336707
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2336707.html