电力工程项目安全与风险管理机制研究
[Abstract]:The development of the national economy can not be separated from the electric power industry, and the electric power industry plays an important role in the development of the national economy. However, the safety of electric power production process is also very important, for the managers of enterprises, this is also a long-term problem. Of course, this is also related to the characteristics of electric power engineering projects. Power engineering projects often have a more complex environment, and the quality of construction personnel is also relatively low. Personal safety has become an important issue in the electric power construction site. The manager should manage the work carefully and realize the overall control of the whole project. It can be said that the safety of power engineering projects is the primary issue. With the rapid development of our country's economy, the positive fiscal policy of our country and the promotion of expanding domestic demand have brought a new opportunity to the development of our country's electric power industry, and the demand of electric power is also more and more. Of course, this also brings some challenges to the safety of electric power production. Because the time of power engineering is relatively tight and the task is very heavy, these contradictions have intensified the problem of power safety. In the process of continuous development of power network technology, there are some loopholes in the previous management mode, which is very disadvantageous to the security of power grid, and even causes great economic losses, because of these power accidents in China. From the above discussion, it can be seen that the use of management means to sum up, safety and risk management is a necessary means to consolidate the basis of safety and strong protection. Based on the theory of project risk management and the theoretical basis of project risk factor analysis, this paper uses the method of multi-level fuzzy comprehensive evaluation to construct the risk assessment model of power engineering project, and puts forward some countermeasures to reduce the risk of power project. The main content of this paper includes six parts: the first part is the preface, the research background, the research significance and the domestic and foreign research present situation. The second part is the basic theory of safety risk management of electric power engineering project, analyzes the relevant theories of safety management and project risk management, and synthetically analyzes the characteristics and management flow of safety risk management of power engineering project. The third part: the identification and classification of power engineering project risk, the basic theory of identifying project risk identification, and the analysis of the types of power engineering project risk in China. The fourth part is the description of power engineering project risk analysis method. The fifth part is the power engineering project risk evaluation, according to the principle of power engineering project risk evaluation, build the power engineering project risk evaluation index system, according to the characteristics of the index system, build the power engineering project risk assessment model. Taking the extension project of Guangping power plant in Handan City, Hebei Province as an example, the practical application of risk assessment model is carried out. The sixth part is to strengthen the power engineering project risk management. Based on the high risk of power engineering project, this paper mainly studies the environmental risk, the economic risk, the technical risk, the management risk and the social risk.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM7
【参考文献】
相关期刊论文 前10条
1 杨秦;;农村电网改造中配电工程的施工管理探析[J];通讯世界;2017年06期
2 江勇;;关于电力配电工程中施工质量控制的探究[J];科技与创新;2016年19期
3 马晨光;;电力工程项目风险管理研究[J];电子制作;2014年09期
4 郭树通;;电力工程项目安全风险管理[J];山东工业技术;2013年13期
5 杨伯青;;电力工程项目管理中风险管理体系的构建研究[J];电子世界;2013年14期
6 梁猛;;电力工程项目风险管理的几点创新研究[J];中国新技术新产品;2013年08期
7 钟康;;电力工程项目施工风险管理研究[J];中国新技术新产品;2012年06期
8 黄蔚;;谈电力基建工程的管理与应用[J];科学之友;2012年06期
9 李伟民;沈辉;程淼生;陈艰;;输变电工程重大危险源风险及应急管理[J];电力与能源;2011年03期
10 王艳;陈国伟;刘金伟;王岩;;工程项目管理中的风险分析与防范[J];中国高新技术企业;2010年27期
相关博士学位论文 前2条
1 陈庆前;电力系统安全风险评估与应急体系研究[D];华中科技大学;2012年
2 王博;复杂电力系统安全风险及脆弱性评估方法研究[D];华中科技大学;2011年
相关硕士学位论文 前10条
1 张良胜;变电站工程项目施工安全评价研究[D];重庆交通大学;2014年
2 苑东林;国际工程项目风险防范机制的研究[D];北京交通大学;2013年
3 张卫东;电力基建工程项目风险管理研究[D];华北电力大学;2013年
4 张志平;供电企业生产作业过程的安全风险管理研究[D];华北电力大学;2013年
5 郁松;电网建设工程项目风险管理研究[D];昆明理工大学;2013年
6 丁华伟;变电站扩建工程项目风险管理研究[D];华中科技大学;2012年
7 李大鹏;电力工程项目风险管理研究[D];东北石油大学;2012年
8 周全;电力基建工程安全管理改进研究[D];浙江工业大学;2012年
9 乐勋;电力工程建设项目精细化管理研究[D];华北电力大学;2012年
10 王志文;基于全寿命周期的电力工程项目风险管理研究[D];华北电力大学;2012年
,本文编号:2342704
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2342704.html