CPR1000余热排出泵地震工况可运行性评价准则初步研究
[Abstract]:The maneuverability of nuclear safety pump under earthquake condition directly affects the safety of nuclear power plant. The function of nuclear safety pump under earthquake condition should be verified by identification. In this paper, the CPR1000 waste heat removal pump is taken as the research object, and the failure mode and the influence analysis of the pump under the seismic condition are carried out by using the fault mode and the (FMEA) method of the influence analysis, and the weak links affecting the operation of the pump are screened out. Based on the function and operation requirements of the components, the evaluation criteria for the operation of pump sets under earthquake conditions are put forward.
【作者单位】: 深圳中广核工程设计有限公司;台山核电合营有限公司;
【分类号】:TL353.12;TM623.8
【相似文献】
相关期刊论文 前10条
1 黄阁;聂鹏;;浅谈CPR1000核电站特种门国产化[J];门窗;2014年02期
2 曹永旺;杨天伟;;CPR1000滨海核电站用水量分析[J];给水排水;2012年S1期
3 马俊贤;石舒健;秦治国;吴帆;邹沫元;蔡瑞忠;;CPR1000压水堆安全壳实时仿真模型研究[J];清华大学学报(自然科学版);2013年08期
4 王晓东;向魁;黄涛;;CPR1000核电站除氧器瞬态计算研究[J];东北电力技术;2014年04期
5 陆秀生;钟质飞;杨勇;;CPR1000核电厂应急柴油发电机组试验方法研究[J];核动力工程;2011年01期
6 左裕轩;苏德颂;;CPR1000相比CPY机组48V直流功能改进安全影响分析[J];仪器仪表用户;2013年05期
7 胡庆来;;CPR1000核电机组与常规百万机组主要电气设备选择差异分析[J];水电与新能源;2013年01期
8 ;我国首座自主品牌CPR1000核反应堆启动[J];工具技术;2010年07期
9 倪立功;顾海霞;刘高俊;王婷;;CPR1000项目KNS系统电源可靠性方案分析[J];核科学与工程;2012年S2期
10 邹诗华;欧小高;向超;;CPR1000核电厂220kV辅助变压器带负载试验新方法研究[J];变压器;2013年01期
相关会议论文 前2条
1 李万华;胡俊祯;;可地浸砂岩型铀矿床选盆选区评价准则讨论[A];第二届全国成矿理论与找矿方法学术研讨会论文集[C];2004年
2 张淑兴;曹宇;;CPR1000核电厂应对超设计基准全厂断电增设移动电源的研究与设计[A];中国核学会核能动力分会2013年学术研讨会论文集[C];2013年
相关重要报纸文章 前2条
1 孙郁瑶;我国CPR1000核电站步入批量化建设[N];中国工业报;2008年
2 通讯员 吴业钦 程向雷;我国首座自主品牌CPR1000核反应堆启动[N];建筑时报;2010年
,本文编号:2470497
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2470497.html