长乐市江田镇配电网规划的研究
[Abstract]:After Jiangtian Town was listed as a pilot town for comprehensive reform in the whole province, leaders at all levels and relevant departments attached great importance to the future development of Jiangtian Town, and Jiangtian Town faced new development opportunities. The electric load in the township will increase rapidly. In order to meet the power demand of the development and construction of the area, to ensure the reasonable layout of the power facilities in the area, to ensure the perfection of the system structure, and to control the reasonable reserve of the power facilities and the land for the route of the line, There is an urgent need for high-standard and all-round planning and construction of the power grid in the region. The distribution network planning scope is the area of Jiangtian town. Firstly, the general situation of economic and social development of Jiangtian town is analyzed. Through the analysis of the present situation of Jiangtian distribution network, the problems of Jiangtian medium and low voltage distribution network are found. According to the economic and social development of Jiangtian Town, and the load and electricity data from 2008 to 2012, the paper uses the method of per capita electricity consumption in the district, the linear regression method, the grey model method, and the growth rate method to forecast the electricity consumption of Jiangtian Town, respectively. By using linear regression method, grey system theory method, natural growth rate method and zonal spatial load density method to forecast the load of Jiangtian Town, the power supply and load of distribution network in each phase of Jiangtian Town Planning are obtained. According to the forecast results and the problems existing in the current power network, the transformation and planning schemes in each period are put forward. In the planning scheme, a series of equipment selection problems are involved, and as many equipment selection schemes as possible are given in the planning and design. Cost estimation, analysis, and safety and reliability of the equipment are considered to select the best scheme as the final plan. Based on the analysis of substation distribution network structure and distribution network equipment in Jiangtian small town of Changle City the paper finds out the shortcomings of Jiangtian power network. According to the general situation of economic and social development of Jiangtian Town and the orientation of town planning, through analyzing the load growth trend and load characteristics of Jiangtian Town, using various methods to forecast the load and electricity quantity of Jiangtian Town, combined with the result of load forecasting, the paper determines the near and middle, In order to ensure the technical and economic feasibility of the optimized planning scheme, the annual power network planning plan of the long-term planning level is analyzed in terms of technology and economy. Through planning, construction and reconstruction, the structure and layout of Jiangtian power network are optimized, which ensures the reliability and quality of power supply, and provides powerful power support for the development of social economy.
【学位授予单位】:福州大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TM715
【相似文献】
相关期刊论文 前10条
1 肖方顺 ,林升题;县城配电网规划的几个原则[J];农村电工;2003年11期
2 苏琳;康积涛;;地理信息系统在配电网规划与设计中的应用[J];华东电力;2006年01期
3 徐漪楠;顾洁;;基于地理信息系统的实用配电网规划软件应用[J];供用电;2006年05期
4 杨卫红;顾巧荣;黄歆璋;;新时期配电网规划中需要关注的几个问题[J];电网技术;2006年S2期
5 章海静;;配电网规划若干问题探讨[J];陕西电力;2007年05期
6 张学伟;赵守明;秦健;;配电网规划对电缆设计的影响[J];黑龙江科技信息;2007年24期
7 林俊;王钇;苏迪;;改进的模糊层次分析法在配电网规划中的应用[J];高电压技术;2008年06期
8 潘锋;储琳琳;张敏华;张宇俊;;配电网规划中接线的综合满意度评价[J];供用电;2008年03期
9 肖峻;崔艳妍;王建民;罗凤章;李亦农;王赛一;王宏;;配电网规划的综合评价指标体系与方法[J];电力系统自动化;2008年15期
10 杜全维;;基于地理信息系统的配电网规划研究[J];科技创新导报;2009年18期
相关会议论文 前10条
1 杨卫红;顾巧荣;黄歆璋;;新时期配电网规划中需要关注的几个问题[A];2006电力系统自动化学术交流研讨大会论文集[C];2006年
2 暴海峰;;配电网规划研究现状[A];2010年云南电力技术论坛论文集(文摘部分)[C];2010年
3 陈显枝;黄宗宣;陈鑫;;福建省试点小城镇配电网规划研究与应用[A];第十九届输配电研讨会论文集[C];2011年
4 张亚璇;唐巍;;考虑负荷不确定的10kV配电网规划研究综述[A];纪念中国农业工程学会成立30周年暨中国农业工程学会2009年学术年会(CSAE 2009)论文集[C];2009年
5 王江涛;刘建新;丁巧林;张铁锋;;层次分析法在配电网规划中的应用[A];2005中国电机工程学会电力系统自动化专委会全国供用电管理自动化学术交流暨供用电管理自动化学科组第二届年会论文集[C];2005年
6 刘云;陈金富;段献忠;;基于遗传序优化算法的配电网规划[A];2006中国电力系统保护与控制学术研讨会论文集[C];2006年
7 汤波;胡荣;符杨;;区县级配电网规划经济性评估的研究[A];中国高等学校电力系统及其自动化专业第二十四届学术年会论文集(下册)[C];2008年
8 杜行;;加强配电网前期规划管理[A];2011年云南电力技术论坛论文集(入选部分)[C];2011年
9 刘建宙;王亚兵;陈坦贵;;楚门镇配电网规划与建设的探讨[A];第二十届华东六省一市电机工程(电力)学会输配电技术讨论会论文集[C];2012年
10 颜华敏;周华;王征;钱建春;史磊;;配电网评估指标体系的建立及在配电网规划管理中的应用[A];2012输变电年会论文集[C];2012年
相关重要报纸文章 前10条
1 辜文金;江津编制“十二五”城市配电网规划[N];国家电网报;2009年
2 黄艳莉;青海农牧区配电网规划建设导则通过验收[N];国家电网报;2011年
3 国网唐山供电公司 宁亮 王晨光 郗渊博;差异布局以点带面 全面提升配电网水平[N];华北电力报;2014年
4 通讯员 黄艳莉;打造适合农牧区发展的配电网[N];中国电力报;2011年
5 通讯员 赵文丽;甘肃电力配电网规划通过评审[N];中国电力报;2013年
6 景玉平 史添;山西完成2013~2020年配电网规划[N];国家电网报;2013年
7 张毓 灵石电视台;浅析城镇配电网规划存在问题及解决方法[N];晋中日报;2012年
8 本报记者 曹瑾;统筹规划配电网建设[N];国家电网报;2011年
9 通讯员 吴建周;常州供电实现乡镇配电网规划全覆盖[N];中国电力报;2012年
10 张军 昂晓龙;和县农村配电网规划出台[N];巢湖日报;2010年
相关博士学位论文 前5条
1 于佳;配电网规划优化方法的研究[D];沈阳农业大学;2008年
2 欧阳武;含分布式发电的配电网规划研究[D];上海交通大学;2009年
3 刘军;配电网智能优化规划平台的算法研究与应用[D];华北电力大学(北京);2008年
4 章文俊;基于接线模式的配电网络优化规划[D];上海交通大学;2009年
5 周nv;基于GIS的配电网规划智能决策支持系统及其算法研究[D];重庆大学;2004年
相关硕士学位论文 前10条
1 张利;市级配电网规划风险评估与规避策略研究[D];华北电力大学;2012年
2 张超;配电网规划后评估方法和实用软件研究[D];重庆大学;2013年
3 王丽娜;计及分布式发电的配电网规划研究[D];山东大学;2015年
4 祁之强;智能电网环境下配电网规划与运营风险型决策模型研究[D];华北电力大学;2015年
5 黄国楠;配电网规划分析与辅助决策支持系统的研究[D];华北电力大学;2015年
6 范宝文;永宁县配电网规划综合评价研究[D];华北电力大学;2015年
7 燕博;配电网典型接线方式的评价研究[D];华北电力大学;2015年
8 刘剑冲;含分布式电源的城市配电网规划方案综合评价研究[D];华北电力大学;2015年
9 马建;宿迁洋河镇区域配电网规划研究[D];华北电力大学;2015年
10 耿军安;秦皇岛海港区西部区域配电网规划研究[D];燕山大学;2015年
,本文编号:2198126
本文链接:https://www.wllwen.com/kejilunwen/dianlilw/2198126.html