当前位置:主页 > 科技论文 > 电力论文 >

抽水蓄能电站工程项目档案过程管理探索

发布时间:2018-10-12 14:52
【摘要】:正抽水蓄能电站是电力系统中最可靠、最经济、寿命周期长、容量大、技术成熟的储能装置,具有调峰、填谷、调频、调相和紧急事故备用等重要作用,是新能源发展的重要组成部分。按照国家电网公司战略部署,到2020年,国网新源控股有限公司投运的抽水蓄能项目将达到44个,装机容量超过5000万千瓦,全面加快抽水蓄能电站建设是社会发展的必然趋势。工程项目档案是抽水蓄能工程的有机组成部分,是指从建设工程从立项、审批、招投标、勘察设计、施工、监理、生产准备到竣
[Abstract]:The positive pumped storage power station is the most reliable, economical, long life cycle, large capacity and mature technology energy storage device in the power system. It plays an important role in peak shaving, valley filling, frequency modulation, phase adjustment and emergency reserve, etc. It is an important part of new energy development. According to the strategic arrangement of the State Grid Company, by 2020, 44 pumped storage projects will be put into operation by the State Grid Xinyuan Holdings Co., Ltd, with installed capacity of over 5000 kilowatts. It is an inevitable trend of social development to speed up the construction of pumped storage power stations in an all-round way. Project file is an integral part of pumped storage project. It refers to the construction project from the establishment, approval, bidding, survey and design, construction, supervision, production preparation to the end
【作者单位】: 浙江仙居抽水蓄能有限公司;
【分类号】:TV743;G275.9

【参考文献】

相关期刊论文 前1条

1 王晓U,

本文编号:2266547


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/dianlilw/2266547.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户93cc2***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com