大型燃气机组调试工作质量管理对策研究
[Abstract]:The electric power industry has the fundamental support function to our country economy and the social development. In the past ten years, our country has vigorously supported the engineering construction of large gas generating units. The commissioning of gas generating unit is the last step in the construction of power generation infrastructure, and it is also the final test of the drawing design, equipment manufacture and system installation of the unit project. Therefore, the quality of commissioning is closely related to the smooth transfer of the new gas unit power station to commercial operation. The purpose of this paper is to make use of the method of theoretical research and case analysis to put forward the detailed countermeasures to the problems faced in the quality management of debugging work in the construction of large gas generating units. First of all, this paper reviews the basic theory of project quality management through literature review. Secondly, it analyzes the characteristics of quality management in commissioning of gas generating units, and starts with the factors affecting the quality of commissioning work. Find out the problems faced by the commissioning of gas units; third, comb the key points of quality management of the commissioning of gas units, and from the perspective of quality management, put forward the corresponding countermeasures; finally, The feasibility of the quality management strategy is analyzed through the case of Chen re relocation project in which the author personally participated. This paper provides a more perfect management model and management system for the commissioning of large gas units. It provides a new idea for the quality management of commissioning in similar large power station projects, and promotes the research and development of quality management theory in the commissioning stage of engineering projects.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TM611
【相似文献】
相关期刊论文 前3条
1 崔士鑫;;党建工作质量管理引入“标准”求长效[J];世界标准信息;2006年07期
2 廖礼进;田爱民;;采用ISO 9001标准提升设备监理工作质量管理的探讨[J];设备监理;2012年02期
3 ;[J];;年期
相关会议论文 前1条
1 郭周克;任连顺;陈爱军;张金富;樊学未;张进;;构建科学的党建工作质量管理新平台[A];2008煤炭企业管理现代化创新成果集[C];2009年
相关重要报纸文章 前10条
1 江苏检验检疫局局长 胡正生;强化检验检疫工作质量管理应坚持的几个原则[N];中国国门时报(中国出入境检验疫报);2000年
2 茂名检验检疫局 李劲松;浅谈构建检验检疫工作长效机制[N];中国国门时报;2008年
3 张涛;焦作局建立工作质量管理体系[N];中国国土资源报;2006年
4 林岗平;强化质量意识 打造“东辰”品牌[N];中煤地质报;2009年
5 华亭煤业集团山寨煤矿党委书记 李华;山寨煤矿党建质量管理体系试点工作的探索与实践[N];甘肃经济日报;2010年
6 ;建立企业党建工作质量管理体系是有益探索[N];光明日报;2006年
7 赵志坚;个旧抓实党风廉政建设[N];红河日报;2008年
8 白秋薇 周兵;党建工作率先通过质量管理认证[N];陕西日报;2009年
9 夏卫红;安庆石化党建质量管理体系运行[N];中国石化报;2009年
10 投运公司党委;推行党建管理体系 创建党建工作新模式[N];石油管道报;2010年
相关硕士学位论文 前2条
1 王文南;大型燃气机组调试工作质量管理对策研究[D];天津大学;2014年
2 舒远兴;政府工作质量管理体系研究[D];南京航空航天大学;2007年
,本文编号:2269432
本文链接:https://www.wllwen.com/kejilunwen/dianlilw/2269432.html