当前位置:主页 > 科技论文 > 地质论文 >

构皮滩拱坝,中文例句,英文例句

发布时间:2016-12-16 15:41

  本文关键词:大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究,由笔耕文化传播整理发布。


1.

Hydroelastic Model Test Research on Releasing Flood Vibration of Arch Dam for Goupitan Project

构皮滩拱坝坝身泄洪振动水弹性模型试验研究

2.

Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station

构皮滩水电站拱坝接缝灌浆施工技术

3.

Analysis of Deformation Effect from Weak Intermediate Beds to Goupitan High Arch Dam;

软弱夹层对构皮滩高拱坝变形影响分析

4.

The Research and Test of No-cover Consolidation Grout in 27# Dam Segment of Goupitan Hydropower Station;

构皮滩水电站27#坝段无盖重固结灌浆试验研究

5.

Experimental Study on Non-Cover-Weight Grouting at Bank-slope Monolith of Goupitan Hydropower Station

构皮滩水电站岸坡坝段无盖重灌浆试验研究

6.

Study on the Temperature Field of Ertan Arch Dam in the First Impounding Period and Its Effect on the Structure of the Dam;

二滩水电站初期蓄水拱坝温度场及对大坝结构特性作用与影响研究

7.

Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;

二滩水电站拱坝工程监理工作后评估

8.

Clough, R. W., "Reservoir Interaction Effect on the Dynamic Response of Arch Dams", Proceedings of US-PRC Bilateral Workshop on Earthquake Engineering. Vol. 1, August, 1982, Harbin, China.

张楚汉、王綦正,紧水滩拱坝动力分析,拱坝技术(中国拱坝情报网刊物),1985年三期.

9.

Consolidation Grouting Test in Non Concrete Layer Foundation in Dam Section on Bank Slope of Goupitan Hydropower Station

浅析构皮滩水电站岸坡坝段无盖重固结灌浆试验

10.

Overload Research of Topography Asymmetry on Baihetan Arch Dam

地形不对称对白鹤滩拱坝超载能力的影响研究

11.

Modal parameter identification of Ertan arch dam from strong earthquake records

基于强震记录的二滩拱坝模态参数识别

12.

Sensibility Analysis on Influence of Deformation Modulus Variation for Ertan Arch Dam Foundation on Dam Stress

二滩拱坝基础变形模量变化对坝体应力影响的敏感性分析

13.

Study about the Deformation Properties of the Columnar Joints Basalts for the Foundation of the High Arch Dam of Baihetan Hydropower Station Jinsha River;

金沙江白鹤滩水电站高拱坝坝基柱状节理玄武岩变形特性研究

14.

Safety Analysis and Simulation of Flood Discharge of High Arch Dam and Counter-arch Plunge Pool;

高拱坝及反拱水垫塘结构泄洪安全分析与模拟

15.

Engineering Geological Feasibility Study of High Arch Dam Construction at Baihetan Hydropower Station, Jinsha River;

金沙江白鹤滩水电站高拱坝建设工程地质适宜性研究

16.

Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;

高拱坝泄洪孔支承结构工作性态分析

17.

Study of RCC Arch Dam Structure of Longshou Hydropower Project;

龙首水电站碾压混凝土拱坝结构研究

18.

Study on Systematical Engineering Geology of Controlling Rock Mass Structure in Dagangshan Arch Dam Foundation;

大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究


  本文关键词:大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究,由笔耕文化传播整理发布。



本文编号:215531

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/diqiudizhi/215531.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户1101e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com