当前位置:主页 > 科技论文 > 海洋学论文 >

半潜式钻井平台锚泊系统设计与试验验证

发布时间:2018-07-18 20:29
【摘要】:针对某深水半潜式钻井平台,为其设计1套多点扩展式锚泊系统。采用数值方法计算船体与系泊系统耦合动力响应,并通过水池模型试验对计算结果进行验证。结果表明,在钻井作业与生存工况下该平台的最大水平偏移与系泊张力均满足规范要求。通过计算结果与试验结果的对比发现,由于水池试验采用等效截断方法低估了系泊缆绳本身的质量惯性与所承受的流体载荷,导致系泊张力的计算结果略大于实验结果。
[Abstract]:A multi-point extended mooring system is designed for a deep water semi-submersible drilling platform. The coupled dynamic response of ship hull and mooring system is calculated by numerical method, and the results are verified by tank model test. The results show that the maximum horizontal deviation and mooring tension of the platform meet the requirements of the specification. By comparing the calculated results with the experimental results, it is found that the mass inertia and the fluid load of the mooring rope are underestimated by the equivalent truncation method in the pool test, which leads to the calculation of the mooring tension slightly larger than that of the experimental results.
【作者单位】: 中海油研究总院;
【基金】:国家科技重大专项项目
【分类号】:P751

【相似文献】

相关期刊论文 前8条

1 张松涛,张鹏,王殿龙,苗华明,刘伟伟,张军,马延德,刘承民;大型半潜式钻井平台高压配电系统的开发研究[J];中国海洋平台;2002年01期

2 ;书讯[J];海洋工程装备与技术;2014年01期

3 梁园华,郑云龙,刘刚,马延德,关伟姝;BINGO9000半潜式钻井平台结构强度分析[J];中国海洋平台;2001年Z1期

4 金德贤;李润培;顾永宁;韩继文;;半潜式钻井平台锚泊系统静力分析[J];上海交通大学学报;1981年02期

5 严锦林,窦钧,高真所,姜福茂;BinGO 9000半潜式钻井平台主体结构建造工艺问题研究[J];中国海洋平台;2001年02期

6 张辉;;深水半潜式钻井平台电力系统的设计研究[J];电工技术;2010年04期

7 马延德;大型半潜式钻井平台结构设计关键技术研究[J];中国海洋平台;2002年01期

8 ;[J];;年期

相关会议论文 前1条

1 胡志强;崔维成;;多学科优化设计在半潜式钻井平台设计中的应用[A];2007年度海洋工程学术会议论文集[C];2007年

相关重要报纸文章 前1条

1 刘鸿琪;首座深水半潜式钻井平台开建[N];地质勘查导报;2008年

相关硕士学位论文 前2条

1 李长东;深水半潜式钻井平台水动力性能分析及响应控制[D];中国海洋大学;2014年

2 潘方豪;深水半潜式钻井平台锚泊定位系统研究[D];上海交通大学;2006年



本文编号:2132681

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/haiyang/2132681.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户2299e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com