当前位置:主页 > 科技论文 > 海洋学论文 >

曹妃甸二期围海造地工程取沙物理模型设计及验证

发布时间:2018-08-24 16:48
【摘要】:为解决曹妃甸首钢围海造地工程用沙问题,计划在曹妃甸甸头东侧滩涂取沙,因关系到曹妃甸岸滩的稳定性,拟通过波浪泥沙物理模型进行试验研究,探讨取沙对岸滩向/离岸运动的影响。基于河口海岸物理模型相似理论,探讨了模型比尺的确定方法及模型沙的选取;在缺乏合适验证资料的情况下,通过三种途径对物理模型的合理性和可靠性进行验证试验,验证试验表明,本模型可将二维沙滩剖面特性研究成果应用于三维条件。
[Abstract]:In order to solve the problem of sand used in the reclamation project of Shougang, Caofeidian, it is planned to take sand from the beach on the east side of Caofeidian head. Because it is related to the stability of Caofeidian bank, it is proposed to carry out an experimental study by using the wave and sediment physical model. The effect of sand extraction on shoreline / offshore motion was discussed. Based on the similarity theory of physical models of estuaries and coasts, the determination method of model scale and the selection of model sand are discussed, and the rationality and reliability of physical models are verified by three ways in the absence of suitable verification data. The experimental results show that the model can be applied to 3D conditions.
【作者单位】: 南京水利科学研究院;
【分类号】:P756.8

【相似文献】

相关期刊论文 前2条

1 赵士清,张镜潮;连云港潮流的数值模拟[J];海洋学报(中文版);1981年03期

2 朱骏荪;;论大型海浪物理模型装置的设计原理(NHL)[J];海岸工程;1988年04期

相关硕士学位论文 前1条

1 张正鑫;围海造地对海洋经济影响综合效益评价研究[D];天津大学;2016年



本文编号:2201421

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/haiyang/2201421.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户ac778***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com