殖民竞争算法在离散制造系统优化问题中的应用研究
[Abstract]:The colonial competition algorithm is a simulation of the colonial competition process in a specific historical stage of human society. It is a population-based meta-heuristic algorithm. The main algorithm operations include empire initialization, intra-empire assimilation, colonial competition and empire deletion. Colonial competition algorithm has been successfully applied in many combinatorial optimization problems. In this paper, the colonial competition algorithm is used to solve some key problems of discrete manufacturing system optimization, including single line equipment layout problem, process route planning problem. The integration of process planning and job shop scheduling and the mixed flow U-type assembly line balancing and sorting problem are discussed. The effectiveness of the algorithm is verified by an example. The main contents of this paper are as follows: (1) the single line equipment layout problem is one of the key problems in discrete manufacturing system optimization. This paper summarizes the current research situation of the single line equipment layout problem, and gives the mathematical model of the problem. Then the implementation steps of colonial competition algorithm are explained in detail. The results of calculation and comparison with other algorithms prove the effectiveness of the algorithm. (2) process route planning is an important part of modern integrated manufacturing system, and it is a bridge between CAD and CAD. In this paper, various possible flexibility in process route planning is considered, the description and optimization objectives of the problem are given, the implementation steps of colonial competition algorithm are systematically introduced, and a test example of solving colonial competition algorithm is presented. The effectiveness of the colonial competition algorithm in process route optimization is verified. (3) the integration of process route planning and job shop scheduling is one of the hot topics in the field of scheduling. Through discussing the necessity and advantage of integration of process planning and job shop scheduling, a new integration strategy is designed, which can optimize the process route and job shop scheduling simultaneously. On the basis of in-depth analysis of the problem, the colonial competition algorithm is used to solve the integration problem of process planning and job shop scheduling. A large number of test examples are used to verify the effectiveness of the colonial competition algorithm in solving the integration problem of process route planning and job shop scheduling. (4) the hybrid U-shaped assembly line balancing and scheduling problem is one of the hot research topics in assembly line balance field. This paper expounds the characteristics of mixed flow U-type assembly line, discusses the two key problems of assembly line balance and product sequencing, introduces the calculation method of optimization target, expounds in detail the implementing steps of colonial competition algorithm, and gives an example to verify it. By comparing the results with other algorithms, it is proved that the colonial competition algorithm is effective in solving the problem of mixed flow U-type assembly line balance and sorting. At the end of this paper, the conclusion and prospect of this paper are given.
【学位授予单位】:华中科技大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:TH186
【共引文献】
相关期刊论文 前5条
1 焦光明;左敦稳;张丹;王珉;;航天产品敏捷总装混流排产模型[J];东南大学学报(自然科学版);2010年04期
2 周艳;;基于JIT的纺织企业战略成本管理[J];企业经济;2012年04期
3 宋华明;马士华;;混合装配流水线上最小makespan的协同优化[J];系统工程理论与实践;2007年02期
4 宋华明;马士华;;考虑流水线平衡的混合装配线排序[J];中国机械工程;2006年11期
5 刘冉;楼佩煌;唐敦兵;杨雷;;解决U形装配线平衡调度问题的免疫协同进化算法[J];中国机械工程;2010年07期
相关博士学位论文 前9条
1 查靓;精益生产方式下U型流水线平衡的优化模型与算法研究[D];华南理工大学;2011年
2 Tchidi Megan Florent(齐弟);精益六西格玛在建筑工程的应用研究[D];天津大学;2011年
3 宋华明;混合流水生产系统的多目标协同优化研究[D];南京理工大学;2003年
4 周亮;装配线平衡的最优化模型与算法研究[D];南京理工大学;2005年
5 许焕敏;基于数理逻辑的工艺推理与决策逻辑方法研究[D];南京理工大学;2008年
6 李新宇;工艺规划与车间调度集成问题的求解方法研究[D];华中科技大学;2009年
7 吴尔飞;双边装配线平衡技术的研究[D];上海交通大学;2009年
8 王炳刚;面向加工—装配混合生产系统的优化排序研究[D];华中科技大学;2010年
9 刘冉;摩擦输送汽车混流装配线中短期决策平衡调度问题研究与应用[D];南京航空航天大学;2012年
相关硕士学位论文 前9条
1 杨德柱;非晶合金变压器制造厂物流系统与设施规划研究[D];华北电力大学;2011年
2 王晨;随机作业时间混流组装线的最优排产研究[D];清华大学;2010年
3 黄祯祥;基于NSGA-Ⅱ的U型混流装配线排序问题研究[D];浙江工业大学;2007年
4 沈冰妹;面向敏捷总装的混合装配线计划调度系统的基础研究[D];南京航空航天大学;2008年
5 李加忠;硬盘装配车间精益设施规划[D];上海交通大学;2009年
6 崔永华;基于粒子群算法的混合装配线计划调度系统研究[D];南京航空航天大学;2009年
7 荣艳林;装配与制造混合的JIT生产系统仿真平台的研究与开发[D];上海交通大学;2009年
8 马建强;基于Petri网的制造系统建模仿真及调度研究[D];浙江师范大学;2010年
9 王亚婷;平准化在一汽轿车生产组织中的应用研究与创新[D];天津大学;2012年
本文编号:2271111
本文链接:https://www.wllwen.com/kejilunwen/jixiegongcheng/2271111.html