基于关键资源的水平集成型虚拟企业任务分配研究
[Abstract]:Due to the rapid change of market and the increasingly fierce competition, small and medium-sized enterprises (SMEs) cluster has brought great challenges. Therefore, aiming at the horizontal cooperative group in small and medium-sized enterprises cluster, this paper constructs the level integrated virtual enterprise, discusses how to strengthen the development and planning management of small and medium-sized enterprises cluster, and how to optimize the allocation of limited resources of enterprise cluster. It has positive significance to promote the scale effect and brand effect of small and medium-sized enterprises cluster. Production task assignment is an important part in the operation stage of horizontal integrated virtual enterprise, which plays a key role in the success or failure of project execution in cross-enterprise cooperation. The research contents of this paper are as follows: (1) the identification of the key resources of the level integrated virtual enterprise through the analysis of the production mode and characteristics of the level integrated virtual enterprise, The operation process of level integrated virtual enterprise based on key resources is put forward. Then, the idea of key resource identification for production process and order is put forward, and the key resource is identified by constructing the evaluation system of key resource index and calculating the evaluation value. (2) production task assignment of level integrated virtual enterprise based on key resources. Firstly, through the analysis of task assignment and task assignment factors, this paper puts forward the idea of using key resource capability to assign tasks to level integrated virtual enterprise. The optimal allocation of the whole virtual enterprise resources can be achieved by optimizing the local resources of each cooperative enterprise. Then, a task assignment optimization model of level integrated virtual enterprise with balanced load rate and lowest cost is established, and genetic algorithm is used to solve integer programming problem. (3) the development and implementation of the prototype system has studied the architecture of the prototype system, designed the function module and database and so on. Finally, a concrete application example has been given to validate the prototype system.
【学位授予单位】:宁波大学
【学位级别】:硕士
【学位授予年份】:2011
【分类号】:TH186
【参考文献】
相关期刊论文 前10条
1 杨丽艳;钱省三;;半导体晶圆生产系统瓶颈识别与管理对策[J];半导体技术;2007年12期
2 罗新星,伍志刚;虚拟企业合作伙伴评价体系及模糊综合评价[J];长沙电力学院学报(社会科学版);2004年01期
3 叶飞,徐学军;基于虚拟企业的绩效协同模糊监控系统设计研究[J];当代财经;2001年05期
4 姜浩,董逸生,罗军舟;基于Petri网的工作流过程建模与分析方法的研究(英文)[J];Journal of Southeast University(English Edition);2000年02期
5 王万良,陈志强,张治辉,吴启迪;面向定单的连续生产过程动态调度方法[J];系统工程;2002年04期
6 陈新林;;基于MTO的多目标优化排产模型[J];工业工程;2009年03期
7 叶飞;虚拟企业利益分配新方法研究[J];工业工程与管理;2003年06期
8 徐汉川;徐晓飞;战德臣;王洪钰;;瓶颈能力均衡优化利用的主生产计划方法[J];哈尔滨工业大学学报;2009年01期
9 夏锐;吴伟;贺敏伟;;基于TOC理论的瓶颈分析及作业调度方案的探讨[J];化工自动化及仪表;2006年04期
10 葛焕森;方志梅;叶飞帆;李国富;;基于Web本体语言的横向型企业集群生产能力建模[J];机电工程;2006年09期
相关博士学位论文 前2条
1 郝文育;虚拟企业生产计划与调度若干关键技术研究[D];南京航空航天大学;2005年
2 姜康;网络联盟企业生产管理关键技术及ASP支持平台研究[D];合肥工业大学;2006年
相关硕士学位论文 前3条
1 陈欣;虚拟企业的运行基础及效应分析——兼论我国企业的虚拟化[D];武汉理工大学;2003年
2 徐恒;基于SCM的车间生产调度模型研究[D];西北工业大学;2006年
3 刘海燕;基于约束理论(TOC)的产品组合决策[D];华中科技大学;2008年
,本文编号:2466305
本文链接:https://www.wllwen.com/kejilunwen/jixiegongcheng/2466305.html