当前位置:主页 > 科技论文 > 矿业工程论文 >

MineSight软件在矿山三级矿量动态管理中的应用

发布时间:2018-05-09 01:20

  本文选题:MineSight + 三级矿量 ; 参考:《中国矿业》2017年12期


【摘要】:矿山地质储量和以及用于指导生产管理的三级矿量经常处于变动状态中,而储量变动的平衡与管理对矿山企业非常重要,如何快速、准确、直观地获取地质资源信息,及时掌握三级矿量的动态增减情况、勘探及准备程度,是矿山企业合理安排采掘计划的重要保证。MineSight三维矿业软件的在三级矿量动态管理中的应用,为矿山资源储量动态管理提供了高效的手段和工具。
[Abstract]:The mine geological reserves and the third-order ore quantity used to guide the production management are often in the state of change, and the balance and management of reserves change is very important to the mining enterprises. How to obtain the geological resources information quickly, accurately and intuitively, and how to obtain the geological resources information quickly, accurately and intuitively. To grasp the dynamic increase and decrease of third-grade ore quantity and the degree of exploration and preparation in time is the important guarantee of rational arrangement of mining plan. MineSight 3D mining software is applied in the dynamic management of third-grade ore quantity. It provides efficient means and tools for dynamic management of mine resources and reserves.
【作者单位】: 贵州开磷集团股份有限公司;
【分类号】:P624.7

【相似文献】

相关期刊论文 前1条

1 朱明德;许梦国;王平;王明旭;李斌;;基于矿体赋存条件的三级矿量优化管理[J];中国矿业;2013年04期



本文编号:1863943

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/1863943.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e2386***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com