上向水平分层充填法采场稳定性的数值模拟分析
本文选题:上向水平分层充填法 + 采场稳定性 ; 参考:《矿业研究与开发》2017年10期
【摘要】:焦家矿区主要采用上向水平进路胶结充填采矿法开采,在厚大矿体区域,矿房与矿柱垂直矿体走向布置,分一步采和二步采,降低了采场生产效率,且提高了采矿成本。因此,在试验采场采用机械化上向水平分层胶结充填采矿法开采,垂直矿体走向布置矿房和矿柱。通过数值模拟分析,综合分析上向水平分层开采过程中的采场的稳定性变化。
[Abstract]:Jiaojia mining area mainly adopts the method of cemented filling mining with upward horizontal approach. In the area of thick large ore body, the vertical orebody strike arrangement of house and pillar is divided into one step mining and two step mining, which reduces the production efficiency of stope and raises the mining cost. Therefore, mechanized horizontal stratified cemented filling mining method is used in the test stope, and vertical orebody strike is used to arrange ore houses and pillars. The stability change of stope in the process of upward horizontal stratification mining is analyzed synthetically by numerical simulation.
【作者单位】: 北京科技大学土木与资源工程学院;山东黄金矿业(莱州)有限公司焦家金矿;金属矿山高效开采与安全教育部重点实验室;
【分类号】:TD853.343
【相似文献】
相关期刊论文 前10条
1 ;某矿水平分层充填法的改进[J];有色矿山;1973年05期
2 David G.Rasmussen;卢德春;;关于提高机械化水平分层充填法生产能力的探讨[J];有色矿山;1983年10期
3 陈海远;马继业;;点柱式上向水平分层充填法在马庄铁矿的应用[J];有色金属(矿山部分);2012年04期
4 张兆辉;张友刚;万兵;王鹏;;无矿柱上向水平分层充填法在石湖金矿的应用[J];矿业研究与开发;2013年05期
5 朱先艳;杨庆雨;李兴平;;浅眼留矿与向上水平分层充填法联合开采试验与应用[J];金属矿山;2009年S1期
6 刘庆宏;;上向水平分层充填法的安全问题探讨[J];现代矿业;2010年06期
7 M.L.Jeremic;谢龙水;;南斯拉夫博尔铜矿横向水平分层充填法开采的岩层动态[J];国外金属矿采矿;1980年05期
8 周旭;阳雨平;王贻明;任建平;;上向水平分层充填法的优化研究[J];矿业快报;2008年08期
9 О.Б.伊万诺夫;杨培章;;上向水平分层充填法回采效率的提高[J];国外金属矿采矿;1985年03期
10 郭雄;乔伟;罗骋;;盘区上向水平分层充填法在谦比西铜矿的应用[J];采矿技术;2011年02期
相关会议论文 前1条
1 朱先艳;杨庆雨;李兴平;;浅眼留矿与向上水平分层充填法联合开采试验与应用[A];第八届全国采矿学术会议论文集[C];2009年
相关博士学位论文 前1条
1 李金华;浅埋煤层采场覆岩破坏及地表移动规律研究[D];西安科技大学;2017年
相关硕士学位论文 前2条
1 王光程;大红山铜矿点柱式上向水平分层充填法研究与应用[D];昆明理工大学;2014年
2 苏振豪;某矿采场稳定性分析及回采顺序优化研究[D];江西理工大学;2017年
,本文编号:2084375
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2084375.html