千米全液压坑道岩心钻机设计
[Abstract]:Tunnel drilling can make use of the existing wells and roadways in old mining areas to explore deep resources, which can meet the needs of deep resources exploration. Tunnel drilling rig is the core equipment of tunnel drilling. The drilling depth, rotation speed, torque and other parameters of tunnel drilling rig produced at present in China can no longer meet the requirements of drilling technology parameters of deep-hole diamond rope core-drilling. On the basis of consulting the technical parameters and working principle of the tunnel drilling rig, this paper summarizes the development status of the rope coring drill, and designs a kind of fully hydraulic tunnel core drill combined with the concrete requirements of the coring technology. The mechanical mechanism and hydraulic circuit of drilling rig are designed according to the general design flow and method of drilling rig. The main research work is as follows: (1) through literature and market research, the development status and market demand of tunnel drilling rig are summarized, and the basic parameters of drilling rig are determined. According to the basic parameters, the main technical parameters of the actuator are calculated. (2) the layout of the drilling rig is determined, which includes drilling unit, power unit and operating table. Using skid chassis loading. (3) the load characteristics of each actuator are analyzed. According to its performance requirements, the speed regulation and voltage regulation methods of each loop are determined: the rotary circuit, the lifting circuit, The load sensitive loop is used in the cored winch circuit and the mud pump driving circuit. The drilling circuit adopts constant pressure drilling circuit. The power distribution mode of double pump and double system is determined, and the hydraulic principle diagram of the whole machine is worked out. (4) the technical parameters of hydraulic components are calculated, and the types and specifications of hydraulic motor, hydraulic pump and motor are selected. The double piston rod two-stage expansion cylinder is designed, and the piston rod is fixed to increase the stroke of the power head.
【学位授予单位】:中国地质大学(北京)
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TD421
【参考文献】
相关期刊论文 前10条
1 王剑华;;地质系统地质机械的研究与开发[J];广东科技;2013年22期
2 闫旭光;聂永晋;狄丽莉;;国内外煤层气钻机技术现状及建议[J];轻工科技;2015年02期
3 殷新胜;田宏亮;姚克;孙保山;邬迪;凡东;;ZDY6000L型履带式全液压坑道钻机的研制[J];金属矿山;2007年12期
4 耿令新;刘钊;吴仁智;张利娟;;工程机械负载敏感技术节能原理及应用[J];机械传动;2008年05期
5 宋菊峰;;潜孔钻机导轨的结构特点及其应用[J];建筑机械;2008年07期
6 ;Technology of load-sensitivity used in the hydraulic system of an all-hydraulic core rig[J];Journal of Coal Science & Engineering(China);2009年03期
7 王成,杜海娥;MK-2型全液压坑道钻机[J];煤田地质与勘探;1998年01期
8 郝世俊,张洪军,韩仕洲,赵永哲;MK系列钻机的开发及应用[J];煤矿机械;2001年05期
9 殷新胜;田宏亮;姚克;凡东;孙保山;;负载敏感技术在全液压动力头式坑道钻机上的应用[J];煤炭科学技术;2008年01期
10 邬迪;;分体式履带钻机的研制与应用[J];金属矿山;2014年03期
相关博士学位论文 前1条
1 田宏亮;全液压动力头式钻机液压系统动态分析及控制方法的研究[D];煤炭科学研究总院;2008年
,本文编号:2411377
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2411377.html