余华寺矿区塌陷坑尾矿干堆条件下深部开采技术研究

发布时间:2019-02-14 18:44
【摘要】:随着生产的持续进行余华寺矿区尾矿库逐渐接近库容上限,尾矿的排放以及深部矿体的开采成为矿山面临的主要难题。为了有效的回收资源,矿山决定-340m之上矿体进行强采,之后利用塌陷坑堆存尾矿,同时选择合理的采矿方案进行深部矿体的开采。 由于余华寺矿区工程地质条件复杂,采用相似模拟试验与数值模拟计算相结合的方法,研究尾矿干堆条件下深部开采的可行性。首先,利用相似模拟试验的方法,分别模拟尾矿干堆后采用无底柱分段崩落法与上向进路充填法开采深部矿体,分析得出采用上向进路充填法更加安全可靠;其次,依据余华寺矿区雨季暴雨多的特点,进行了不同降雨条件下尾矿干堆后深部开采模拟,结果表明为防止暴雨侵袭,尾矿干堆排放需要采取一定的加固措施;再次,利用数值模拟的优势,,模拟-340m以上强采、塌陷坑尾矿干堆、-340m以下深部开采的过程,揭示了开采过程中塌陷区受力特征、地表沉降特征和干堆尾矿稳定性;最后,结合模拟试验过程与结果提出相应的安全防治措施供矿山实践参考。 通过尾矿干堆技术利用矿山废弃空间堆存尾矿,不但解决了尾矿排放问题,而且回填了废弃空间,取得一举两得的效果,给矿山带来良好的经济效益与社会效益,是一种值得推广的技术手段。
[Abstract]:With the development of production, the tailings reservoir of Yu Hua Si mining area is gradually approaching the upper limit of the reservoir capacity. The discharge of tailings and the mining of deep orebodies become the main problems facing the mines. In order to recover resources effectively, the mine decides to take strong mining of ore body above -340 m, and then pile up tailings with collapse pit, and select reasonable mining plan to mine deep orebody. Due to the complexity of engineering geological conditions in Yu Hua Si mining area, the feasibility of deep mining under dry pile condition of tailings is studied by using the method of similar simulation test and numerical simulation. Firstly, the method of similar simulation test is used to simulate the tailings dry pile, and the sublevel caving method without bottom pillar and the filling method of upward approach are used to mine the deep orebody, and it is concluded that it is more safe and reliable to adopt the method of upward approach filling. Secondly, according to the characteristics of heavy rain in the rainy season of Yu Hua Si mining area, the deep mining simulation of tailings dry pile under different rainfall conditions is carried out. The results show that in order to prevent rainstorm, some reinforcement measures should be taken for tailings dry pile discharge. Thirdly, the advantage of numerical simulation is used to simulate the process of strong mining above -340 m, dry pile of collapse pit tailings and deep mining below -340 m, which reveals the mechanical characteristics of subsidence area, surface subsidence characteristics and the stability of dry pile tailings in the process of mining. Finally, combined with the simulation test process and results, the corresponding safety prevention and control measures are put forward for mine practice reference. By using the technology of tailings dry pile to store tailings in waste space, not only the problem of tailings discharge is solved, but also the waste space is backfilled, and the effect of killing two birds with one stone is obtained, which brings good economic and social benefits to the mine. It is a technical means worth popularizing.
【学位授予单位】:武汉科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TD926.4

【参考文献】

相关期刊论文 前10条

1 任凤玉;王文杰;韩智勇;;无底柱分段崩落法扇形炮孔爆破机理研究与应用[J];东北大学学报;2006年11期

2 毕忠伟;;基于PFC2D的浅埋深煤层矿压显现规律分析[J];矿业安全与环保;2013年03期

3 孙文勇;陈星明;谭宝会;张志贵;;复杂矿体条件矿石损失贫化原因及对策[J];辽宁工程技术大学学报(自然科学版);2013年10期

4 李越,崔学奇,张治元,吕宪俊,王冠甫;尾矿充填地下采空区及塌陷坑脱水工艺研究[J];金属矿山;2000年07期

5 吕宪俊,连民杰;金属矿山尾矿处理技术进展[J];金属矿山;2005年08期

6 王永清;宋卫东;杜翠凤;蔡嗣经;;金属矿山井下泥石流发生机理分析[J];金属矿山;2006年08期

7 杜建华;匡忠祥;宋卫东;王永清;;井下泥石流发生机理数值模拟研究[J];金属矿山;2008年04期

8 张艳博;李占金;甘德清;;程家沟铁矿露天坑排尾后地下采场参数的研究[J];金属矿山;2008年05期

9 欧阳治华;王胜开;全中学;;矿山井下泥石流形成机理与固液耦合数值模拟研究[J];金属矿山;2008年10期

10 王培涛;杨天鸿;柳小波;;无底柱分段崩落法放矿规律的PFC~(2D)模拟仿真[J];金属矿山;2010年08期



本文编号:2422484

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/2422484.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户bd066***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com