高速公路下开采的地表沉降控制与预测
[Abstract]:A copper-zinc mine is located under the expressway. In order to ensure the safe operation of the expressway, on the basis of the analysis of geological conditions, two protective measures are put forward: reserving 100 m security pillar and adopting subsequent filling mining method. In order to control the influence of the surface rock movement on the expressway; With the help of FLAC3D numerical simulation software, the filling process of mining is simulated, and the law of surface rock movement is analyzed. The simulation results show that the maximum horizontal deformation of 1.3 脳 10 ~ (- 3) mm/m, is-1.56 脳 10 ~ (- 3) mm/m, under the influence of the two protection measures. The maximum curvature is 0.032 脳 10 ~ (- 3) / m, which accords with the safety regulation, indicating that underground mining will not affect the safe operation of expressway under this scheme.
【作者单位】: 北京科技大学土木与环境工程学院;
【分类号】:TD327
【相似文献】
相关期刊论文 前10条
1 周正濂;子彦;;缩小水体下保安矿柱尺寸的方法[J];世界采矿快报;1988年24期
2 王志方;竖井稳定性与保安矿柱开采[J];有色矿冶;1993年06期
3 王宏伟,,王志方;用“安全深度”对竖井矿柱的圈定与开采[J];化工矿山技术;1994年05期
4 王志方,张合君;探讨保安矿柱回收相关问题[J];有色矿冶;1997年02期
5 王洪江,路东尚,熊伟,刘振东,马天贵,李金奎;竖井保安矿柱回收试验研究[J];黄金;2002年05期
6 金小田,金世伦,谢世禄,张世斌;缓倾斜薄矿体保安矿柱的回收[J];中国矿业;2004年06期
7 宋卫东;陈志海;郭廖武;唐国友;;程潮铁矿保安矿柱控制开采相似模拟实验研究[J];矿业研究与开发;2009年04期
8 杨小平;祝禄发;于水;;重要建(构)筑物下保安矿柱开采试验研究[J];采矿技术;2012年05期
9 M.H.崔加罗夫;王维德;;戈罗布拉哥达特矿床保安矿柱的回采工艺[J];国外采矿技术快报;1987年21期
10 杨培章;湘沅;;水体下保安矿柱的开采[J];世界采矿快报;1990年01期
相关会议论文 前2条
1 李胜辉;杨闯;范天文;王靖;;司家营铁矿平青大公路保安矿柱开采方法的研究[A];第十八届川鲁冀晋琼粤辽七省矿业学术交流会论文集[C];2011年
2 曹明秋;钟纪胜;曾德华;;锡矿山南炼厂保安矿柱342巷道爆破参数探讨[A];2005年全国金属矿山采矿学术研讨与技术交流会论文集[C];2005年
相关硕士学位论文 前4条
1 秦杨;张家滩磷矿保安矿柱开采技术研究[D];江西理工大学;2010年
2 李其昌;金阳公路保安矿柱开采技术研究[D];中南大学;2004年
3 王铮朗;中深部金属矿保安矿柱爆破回采的动力响应特性研究[D];武汉理工大学;2014年
4 李刚;矿山开采引起的地应力变动过程及矿柱回收时可能发生的力学失稳模式的研究[D];兰州大学;2011年
本文编号:2439433
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2439433.html