淄博市淄川区工业园区水土保持方案编制分析
发布时间:2018-06-08 23:14
本文选题:淄博市 + 工业园区 ; 参考:《山东大学》2015年硕士论文
【摘要】:随着科学技术的快速发展,开发建设项目如雨后春笋般快速增多,而工业园区项目也在全国各地积极筹建,且发展势头良好。工业园区已成为促进地方经济迅猛发展的重要力量。与此同时,工业园区的建设将大面积扰动原地貌,破坏植被,对区域环境和生态平衡都会造成不良影响。为此,编制工业园区水土保持方案意义重大,是贯彻国家法律法规的体现,是控制工业园区项目建设引起水土流失的有效途径。工业园区项目属于典型的点型工程,园区占地面积大,上马项目多,基础建设内容多,工程施工扰动地面面积大,建设工期长,开挖土石方较大是该类工程的主要特点。本文在编制过程中,分以下几个重要部分:工业园区水土保持现状及存在的问题、项目基本情况、土石方平衡、水土流失预测、水土保持监测、工程设计和防治效果分析。通过水土流失预测,确定工业园区重点防治时段、区域、监测点位和监测时段。根据工程建设分期实施方式,将项目分为2个一级分区;根据分期实施的布局,将项目分为8个二级分区;根据建设功能、建设内容、、扰动和破(损)坏地面的程度、采取不同的防治措施等因素,将项目区分为33个三级分区。项目开挖土石方和表土剥离量较大,根据现状地形地貌,做到区内土石方平衡。在施工过程中,减少占地、减少扰动面积、避开雨季和大风天气施工,合理布设水土保持防治措施,减少工程建设产生的水土流失。本论文的研究成果为工业园区水土保持方案编制提供了理论依据和技术支持,有效的控制了工程建设过程产生的水土流失,根据园区水土流失特点,提出了综合防治体系,真正起到为开发建设项目保驾护航的作用。
[Abstract]:With the rapid development of science and technology, the development and construction projects have mushroomed rapidly, and the industrial park projects are also actively prepared and developed in all parts of the country. The industrial park has become an important force to promote the rapid development of the local economy. At the same time, the construction of industrial parks will greatly disturb the original landforms and destroy the vegetation. Therefore, it is of great significance to the regional environment and ecological balance. Therefore, it is of great significance to compile the water and soil conservation scheme in the industrial park. It is the embodiment of the national laws and regulations and the effective way to control the soil erosion in the industrial park project. The industrial park project belongs to the typical point type project, the area is large and the project is many. There are many basic construction contents, large ground area of construction disturbance, long construction period and large soil and stone excavation, which are the main characteristics of this kind of project. In this paper, the following important parts are divided into several important parts: the status and existing problems of soil and water conservation in Industrial Park, the basic situation of the project, the balance of earth and stone, the prediction of soil and water loss, and the monitoring of soil and water conservation. Test, engineering design and prevention and control effect analysis. Through the prediction of soil erosion, the key prevention and control period, area, monitoring point and monitoring period of industrial park are determined. According to the construction stage implementation mode, the project is divided into 2 first level zoning. According to the layout of the stages, the project is divided into 8 two level zoning; according to the construction function, the construction content is based on the construction function. The project is divided into 33 three level zoning, with the degree of disturbance and breaking (damaged) the bad ground. The project is divided into 33 three grade zones. The research results of this paper provide theoretical basis and technical support for the establishment of water and soil conservation scheme in the industrial park, effectively control the soil erosion caused by the construction process, and put forward a comprehensive control system based on the characteristics of the water and soil loss in the park. Play a role in protecting the development and construction projects.
【学位授予单位】:山东大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:S157.2
【参考文献】
相关期刊论文 前4条
1 于宝良;张春萍;;浅谈治理水土流失的水土保持工程措施[J];民营科技;2011年03期
2 冯绍元,丁跃元,姚彬;用人工降雨和数值模拟方法研究降雨入渗规律[J];水利学报;1998年11期
3 石生新;高强度人工降雨条件下地面坡度、植被对坡面产沙过程的影响[J];山西水利科技;1996年03期
4 张小林;;对加强工业园区水土保持方案编报管理的思考[J];中国水土保持;2013年07期
,本文编号:1997632
本文链接:https://www.wllwen.com/kejilunwen/nykj/1997632.html