EPC项目的BIM应用风险管理研究
[Abstract]:According to DBIA's survey of recent years of EPC (Design-Purchasing-Construction) projects, after 2017, The construction general contract management mode will occupy more than 50% in the construction market. The EPC model is becoming the leader of many general contracting modes, and its share is increasing year by year. After CAD (computer aided Design), the second revolution in the construction industry, triggered by BIM (Building Information Model), is in full swing. Especially in the series of documents issued continuously by the Ministry of National Housing and Construction, BIM has been fully emphasized and affirmed. It can be predicted that the introduction of BIM into the EPC project will be the inevitable trend for the general contracting project to realize the information management, but the risk of the BIM application in the construction enterprise is not paid enough attention in the current upsurge of BIM application in the construction enterprise. Especially, the risk of BIM application in EPC project is seldom considered, which will lead to the failure of BIM application and even make EPC project suffer great loss. Combined with the BIM application of EPC project, this paper makes a deep analysis of the risk problems in the application of BIM in EPC project, and mainly studies the following aspects: first, combing the relevant theory of BIM application in EPC project. The BIM application points of EPC project are summarized, and the risk characteristics of BIM application of EPC project are put forward. By comparing the BIM application of general project, different participants are considered as a whole in each stage of EPC project. The dimension model of BIM application risk identification of EPC project is established. Secondly, the key words of this paper are searched in the literature database, and the relevant data are analyzed by combining the practical experience and expert investigation results. Identify the BIM application risk of EPC project, find out the BIM application risk factor index set of EPC project, at the same time do a good job of hierarchical classification, lay the foundation for risk evaluation; third, After comparing and analyzing the current mature and popular risk assessment methods, according to the characteristics of the evaluation object, the fuzzy analytic hierarchy process (FAHP),) is selected to establish the BIM application risk evaluation model of the EPC project, and combined with the actual cases. The applicability of the evaluation model is verified. Fourthly, in order to reduce the loss of BIM application in EPC project and improve the risk management ability and level of the project, this paper puts forward the method and flow of BIM application risk management in EPC project combined with the actual project. The corresponding control method is given for the identified risk factors, and the BIM application risk management system of EPC project is established. Through the study of this paper, it will provide a useful reference for the EPC project to adopt BIM, and avoid or reduce the loss caused by blindly following the wind regardless of the conditions.
【学位授予单位】:西安科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU17;TU71
【参考文献】
相关期刊论文 前10条
1 刘海龙;赵宇明;;BIM技术在万达交钥匙工程中的应用[J];工程建设与设计;2016年10期
2 张辉;祖丕祥;李永福;贺庆;;基于结构方程的BIM技术应用风险评价研究[J];工程管理学报;2016年04期
3 巴特;马玉柱;;BIM技术在EPC石化码头的应用研究[J];港工技术;2016年03期
4 俞涛;毛江山;沈伶妮;;嘉善:打造创客联盟 推动青年创新[J];中国电力企业管理;2016年10期
5 杨冬梅;董娜;;业主方BIM应用障碍及评价体系研究[J];工程经济;2016年04期
6 李智;王静;;施工阶段BIM应用风险及应对策略[J];土木建筑工程信息技术;2016年02期
7 郭力;;工程建设项目BIM应用风险分析与应对[J];建筑经济;2015年03期
8 蔡伟庆;;BIM的应用、风险和挑战[J];建筑技术;2015年02期
9 孟昕;;软件信息化风险管理研究[J];信息技术;2014年12期
10 刘文平;郭红领;任剑波;武电坤;刘兵全;;BIM在EPC公路工程中的应用模式研究[J];建筑经济;2014年09期
相关硕士学位论文 前10条
1 陈广袤;信息技术风险管理研究[D];中国政法大学;2015年
2 高浪;基于BIM技术的EPC项目成本的动态控制[D];长安大学;2014年
3 李俊超;BIM技术扩散的阻碍研究[D];哈尔滨工业大学;2014年
4 赵灵敏;基于BIM的建设工程全寿命周期项目管理研究[D];山东建筑大学;2014年
5 宋建国;建设工程项目风险管理分析[D];吉林大学;2013年
6 黄波;建设工程项目风险分析与管理研究[D];南京理工大学;2013年
7 金卫东;某BT项目风险的评估与应对策略研究[D];华南理工大学;2013年
8 侯丽娜;光伏建筑项目风险管理研究[D];华北电力大学;2012年
9 潘丽萍;工程项目风险管理应用研究[D];西安建筑科技大学;2009年
10 涂国华;基于模糊层次分析法的3G项目风险管理研究[D];上海交通大学;2009年
,本文编号:2154930
本文链接:https://www.wllwen.com/kejilunwen/ruanjiangongchenglunwen/2154930.html