工程建设项目全寿命周期造价管理研究

发布时间:2018-03-30 22:17

  本文选题:工程建设项目 切入点:全寿命周期 出处:《天津大学》2013年硕士论文


【摘要】:随着我国经济建设发展,工程建设项目发展速度十分迅猛。做好建设项目的造价管理对于提高投资使用效率,节约固定资产投资总额起着至关重要的作用,并有助于从整体上改善社会经济效益。在某种意义上讲,工程管理问题层出不穷的原因是工程造价管理理论和方法上不足,因此必须对工程造价进行改革研究,,建立起我国科学规范的工程建筑业管理体制和运行机制,以达到对工程造价的有效管理和合理控制。 本文通过分析,以现阶段造价控制存在的问题作为研究切入点,结合全寿命周期造价管理理论特点,对工程建设项目进行了五阶段划分,并阐述了各阶段的控制重点。在工程建设项目阶段划分的基础上阐述全寿命周期造价费用构成。 通过分析分别确定了本文对工程建设项目在各阶段各种成本控制的重点,阐述了各阶段造价控制中存在的主要问题及研究的意义,在此基础上提出个相应的造价控制的方法,以此来实现工程建设项目成本最低的目标。
[Abstract]:With the development of economic construction in our country, the development speed of engineering construction project is very swift and violent.The cost management of the construction project plays an important role in improving the efficiency of investment and saving the total investment of fixed assets, and it is helpful to improve the social and economic benefits as a whole.In a sense, the reason why engineering management problems emerge one after another is that the theory and method of engineering cost management are insufficient, so it is necessary to reform and study the project cost.In order to achieve effective management and reasonable control of project cost, a scientific and standardized management system and operation mechanism of engineering construction industry have been established in China.Based on the analysis of the problems existing in the cost control at the present stage and the characteristics of the life-cycle cost management theory, this paper divides the construction project into five stages, and expounds the key points of the control in each stage.Based on the division of construction project stage, the cost composition of whole life cycle is expounded.Based on the analysis, the emphasis of this paper on the cost control of the construction project in each stage is determined, and the main problems and the significance of the research in each stage are expounded. On the basis of this, a corresponding method of cost control is put forward.In order to achieve the lowest cost of engineering construction project goal.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU723.3

【参考文献】

相关期刊论文 前3条

1 杨赞锋,张引娟;工程造价预测中的系统分析[J];人民长江;2003年10期

2 钱闪光;李云;;全过程造价管理与全生命周期造价管理的对比研究[J];西部探矿工程;2010年06期

3 杜继成;;工程项目成本控制浅议[J];项目管理技术;2006年06期



本文编号:1687894

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/sgjslw/1687894.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户7eed7***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com