基于BT模式的桐庐县分水镇广场项目建设研究

发布时间:2018-05-31 15:00

  本文选题:城乡统筹 + 基础设施建设 ; 参考:《浙江大学》2013年硕士论文


【摘要】:近年来,随着国家对城乡统筹经济社会发展基本方针的部署,各地对统筹城乡,推进一体化发展进行了不断的探索与实践。在实践中,各地乡镇基层政府对城市基础设施建设的投入不断加大。在建设资金严重缺乏的情况下,基层政府开始尝试通过多元化的投融资渠道进行基础设施建设。采取BT模式建设城市基础设施就是其中之一。BT模式能够实现投资多元化、利益共享、风险共单,不但有效的减缓政府财政压力,而且由于其机制新、管理活、权责明确,比传统的政府单独投资建设模式更为高效。 但是,BT模式作为一种新型吸引民间资本参与的方式,对很多基层政府来说还是一个陌生的事务,缺乏相关的专业知识和规范性制度。论文通过BT模式文献综述,阐明了国内外BT模式发展历程、理论研究和运作模式。在此基础上,分析了BT模式在桐庐基础设施建设中的应用现状,从BT模式的关键环节、合同风险、法律关系、成本估算等方面,对桐庐现行BT模式存在的问题进行了分析并提出了应对措施。最后以桐庐分水镇的BT模式项目为研究对象,进行了实例分析。论文的研究成果可为地方基层政府探索多样化、规范化的融资平台以及工程建设提供参考。
[Abstract]:In recent years, with the deployment of the basic policy of overall economic and social development in urban and rural areas, all over the country to coordinate urban and rural areas, to promote the integration of the development of continuous exploration and practice. In practice, local township-level government investment in urban infrastructure construction is increasing. In the case of serious lack of construction funds, grass-roots governments began to try to carry out infrastructure construction through diversified channels of investment and financing. Adopting BT mode to build urban infrastructure is one of them. BT mode can realize diversification of investment, benefit sharing and risk sharing. It not only effectively reduces the pressure of government finance, but also because of its new mechanism, active management, clear powers and responsibilities. It is more efficient than the traditional government investment model. However, as a new way to attract private capital participation, the BT model is still a strange affair for many grass-roots governments, lacking relevant professional knowledge and normative system. Through the literature review of BT model, this paper expounds the development course, theoretical research and operation mode of BT model at home and abroad. On this basis, the paper analyzes the application status of BT model in Tonglu infrastructure construction, from the key links of BT model, contract risk, legal relationship, cost estimation, etc. This paper analyzes the problems existing in the current BT model of Tonglu and puts forward some countermeasures. Finally, taking the BT model project of Tonglu Fenshui Town as the research object, a case study is carried out. The research results can provide reference for local grass-roots government to explore diversification, standardized financing platform and engineering construction.
【学位授予单位】:浙江大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU71

【参考文献】

相关期刊论文 前10条

1 房小兵;;关于BT工程建设方式的探讨[J];对外经贸财会;2003年12期

2 王灏;PPP的定义和分类研究[J];都市快轨交通;2004年05期

3 刘德标;菲律宾的BOT法及其投资利弊[J];对外经贸实务;1996年06期

4 王铁山;;PFI项目融资:英国和日本模式的比较研究[J];国际经济合作;2008年01期

5 雷淑琴;;项目融资方式BOT与PFI之比较分析[J];北方经济;2010年11期

6 林平;;基于BT模式的建设工程工期索赔问题研究[J];河北工程大学学报(社会科学版);2010年02期

7 杨红新;;创新中心镇小城市化模式——以浙江小城市培育为例[J];经济研究导刊;2012年10期

8 丁井余;;BT项目工程造价咨询探讨[J];建筑经济;2010年05期

9 朱卫东;公益性基础设施项目融资新方式[J];中国投资;2002年08期

10 谢立惠;;浅析BT融资模式的会计处理方法[J];现代经济信息;2012年18期



本文编号:1960179

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/sgjslw/1960179.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户99305***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com